An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IBL ENGINEERING IBL AND SILICON R & D MEETING

  2. MPC COVERS • Designed and machined by Maarten WEBER. • Made of three separate covers • Aluminium bridges on top of Plexiglas covers: • Assembled and installed. N2

  3. IPT SEALING CAPS • 5 injection molds made by SLA process • First cap sample made of polyurethane tested: • As expected • Released the production of 30 parts

  4. IPT TITANIUM SHIELDING • Epoxy loaded with silver is an issue for the activation • Test to implement a bonded shielding mesh: • Decrease the amount of silver.

  5. IPT TITANIUM SHIELDING • Maarten removed the silver epoxy using turning process • Conductivity not as low as in the beginning configuration (2 Ω instead of 2500 Ω) • We will put the part at 200°C to disassemble it • Remove glue with turning process • Bond epoxy 9394 • Implement mesh + silver epoxy

  6. DUMMY MPC • Needed to test installation procedure on the scale one mockup. • We use the prototype IST (K13C/RS3) • Aluminium frame assembled and precisely adjusted by Louis and Augusto

  7. DUMMY MPC • Precisely cut using the tool of Gerard. • Minimized the amount of CF dust.

  8. DUMMY MPC • Open the MPC. • Prepare surface on IST and aluminium plates • Mask the bonding area

  9. DUMMY MPC • Apply HYSOL 9394. • Close the MPC