High Speed UAV Team 4th Update Presentation
Introduction • Schedule and Status – Brad • Critical Function Prototypes (CFPs) – Brian • Conclusion - Steve
Schedule/Status • Carbon Fiber Shell • Lay up re-attempted: Behind Schedule • Complete Shell: Mid December • ½ Scale CNC Model • Wing Section Successful • Complete Airframe: Mid December
Schedule/Status • Funding • Potential Donor • Commitment by End of the Year • Fluent Analysis Complete • Parameters • Results Analyzed
Wing: Top View Flow
CFPs • Carbon Fiber Body • ½ Scale Wind Tunnel Model • RC Airplane
Carbon Fiber Body • Purpose • Learn Carbon Fiber Techniques • Test Strength • Cost and Time of Manufacturing • Lessons Learned • Molds • Lay Up Techniques
½ Scale Wind Tunnel Model • Purpose • Verify Results of Fluent Analysis • Wind Tunnel Testing • Lessons Learned • CNC Techniques • ½ Scale vs. ¼ Scale
RC Airplane • Purpose • Learn and Test Controller • Utilize RC Components • Lessons Learned • Small Aircraft Construction • Airplane Ready to Go • Awaiting Purchase of Controller
Conclusion • Schedule/Status • CFPs • Funding • Fluent • CFPs • Purpose • Lessons Learned