1 / 11

Montenegrin Investment Promotion Agency - MIPA

South East European Business Forum - Energy potential of Montenegro. Montenegrin Investment Promotion Agency - MIPA. Istanbul, November 2012. South East European Business Forum - Energy potential of Montenegro. Legislation/Strategies Energy sources Transmission line Role of MIPA.

Download Presentation

Montenegrin Investment Promotion Agency - MIPA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. South East European Business Forum - Energy potential of Montenegro Montenegrin Investment Promotion Agency - MIPA Istanbul, November 2012

  2. South East European Business Forum - Energy potential of Montenegro • Legislation/Strategies • Energy sources • Transmission line • Role of MIPA

  3. Legislation/Strategies • Energy Efficency Law • Energy Law • Concession Law • Energy Development Strategy of Montenegro (2025. year) – Action plan

  4. Energy sources Hydro Potential • Total  theoretical  hydro-­potential  of  Montenegro,  as  given  in  the  Water  Management   Plan  of  Montenegro,  is  ~10  TWh,  17  %  used. • HPPs  Moraca • Technical  characteristics: • 4  HPPs,  total  installed  power  242  MW • Annual  production  620-­720  GWh   • Investment:  540  M

  5. Energy sources • Wind Power • Solar Power • Biomas Power

  6. Energy sources Thermo Power • Construction of the second unit of Thermo Power Plant “Pljevlja” (225 MW) • Open pit mine “Maoce”

  7. Transmission line Interconnection Lines and Transmission Lines in Montenegro • Line 400 kV Podgorica – Tirana was finished in 2011 • Overhead line 400 kV Montenegrin Coast – Pljevlja • Substation on the cost • Interconnection lines to Serbia and BiH • Investment 90 M EUR

  8. Transmission line Undersea Interconnection Line Italy -Montenegro • 375 km of undersea cable • 1000 MW capacity • Project Developed in cooperation with TERNA (Italy) and CGES – November 2010 • Start of operation – 2015 • Investment 700 M EUR

  9. Role of MIPA MIPA was set up in 2005 to promote foreign investments and facilitate economic development in Montenegro. • To assist foreign investors • To remove red tapes • To calculate foreign direct investments

  10. Web site: www.mipa.me E-mail: blagota.radulovic@mipa.co.me

  11. Thank You!

More Related