1 / 17

ROUTAGE ECHELLES A CABLES DANS TDC2

ROUTAGE ECHELLES A CABLES DANS TDC2. SITUATION ACTUELLE. VUE SUR PASSERELLE, VERS TCC2, FIN SECTION 8m SITUATION ACTUELLE. VUE SUR PASSERELLE, VERS TCC2, DEBUT SECTION 6m SITUATION ACTUELLE. TDC2 : TRANSITION SECTION 8m VERS SECTION 6m SITUATION ACTUELLE. TDC2 SECTION 8m.

sanam
Download Presentation

ROUTAGE ECHELLES A CABLES DANS TDC2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ROUTAGE ECHELLES A CABLES DANS TDC2 SITUATION ACTUELLE

  2. VUE SUR PASSERELLE, VERS TCC2, FIN SECTION 8mSITUATION ACTUELLE

  3. VUE SUR PASSERELLE, VERS TCC2, DEBUT SECTION 6mSITUATION ACTUELLE

  4. TDC2 : TRANSITION SECTION 8m VERS SECTION 6m SITUATION ACTUELLE TDC2 SECTION 8m 5 ECHELLES COTE JURA TDC2 SECTION 6m

  5. A A TRANSITION SECTION 8m  6m SITUATION ACTUELLE

  6. D D DEBUT SECTION 6m : SITUATION ACTUELLE

  7. 3 MSSB TCSC D D VOLUME ECHELLES SECTION 6m : PASSAGE ECHELLES DE LA PASSERELLE VERS MUR “JURA”

  8. Proposition echellesau sol cote machine EN NUANCES DE VERTS : ECHELLES CONTROLE EN JAUNE : ECHELLE SERVICES GENERAUX EN ROUGE : ECHELLE PUISSANCE

  9. A A Section de depart = section existante

  10. B B • Degagementechelle SG vers cote saleve • Degagement OD 110 vers OD??? • OD??? Devient OD110 • Reste de la section inchange OD110 OD??? SG

  11. C C • Degagement OD 118 vers cote Saleve OD118

  12. D D MDLV.240104 ~28m • Mouvementexistant de OD110 versmurSaleve Section sur premiere partie TDC2  MDLV.240104 a peupres OD110

  13. 3 MSSB TCSC E E • Fin de la passerelle • Degagement OD 114 versmurSaleve MDLV.240104

  14. 3 MSSB TCSC F F • 2 echelles 600 surpasserelle 3 echelles 400 au sol

  15. 3 MSSB TCSC G G ECHELLES EXISTANTES MSSB MSSB MSSB

  16. TCSC 3 MSSB H H

  17. TCSC I I • 3 echelles AL 400 au sol  configuration existante