390 likes | 521 Views
An Outlook from Asia. Atsuto Suzuki. Grenoble, July 27, 2011. Outline. 1. KEK Recovery Plan. 2. HEP Project in the Decades. 3. Quark Flavor Physics Project. 4. Lepton Physics Project. 5. Energy Frontier Project. 6. Non-Accelerator Physics Project. 7. Summary.
E N D
An Outlook from Asia Atsuto Suzuki Grenoble, July 27, 2011
Outline 1. KEK Recovery Plan 2. HEP Project in the Decades 3. Quark Flavor Physics Project 4. Lepton Physics Project 5. Energy Frontier Project 6. Non-Accelerator Physics Project 7. Summary
5/16 5/23 6/6 SuperKEKB
Europe Overseas Researchers(4/1~6/15): 133(person), 1214(person・day) Canada:12 Americas UK:11 Russia:8 Beraruce:1 Ireland:1 Sweden:1 Poland:4 Kazak stan:1 USA:31 Germany:2 Hungary:1 APS, SSRL, ALS, Triumph SNS, FNAL, BNL, J-Lab, PNNL Belgium:1 Bulgaria:1 Universities France:11 Swiss:2 Georgia: 1 Slovenia:2 KEK Asia Italy:4 Korea:11 J-PARC with JAEA Spain:3 Greek:1 China:12 India:2 Taiwan:2 LANCE, RAL, PSI, ESRF, MAX, DIAMOND Malaysia:1 NSRRC, SSRF, AS Sri Lanka:1 Australia:1
Daddy - Long - Legs Donation from CERN goes to orphans of the earthquake 9 May 2011 A donation of 53,280 CHF raised by employees and friends of CERN will go to Ashinaga, a non-profit organization which provides financial, educational and emotional support to children whose parents or guardians were lost or seriously injured as a result of the earthquake and the ensuing tsunami. The decision to donate to Ashinaga came after intimate discussion between Rolf Heuer, Director General of CERN, Atsuto Suzuki, Director General of KEK, and Shoji Nagamiya, Director of J-PARC. KEK would like to express our sincerest appreciation to those who support Japan, both in emotion ways and in terms of donations.
3. Quark Flavor Physics Project ∫L = 50 ab-1
Partially funded (100 M$) Almost fully funded 350 M$ 30 M$ (2009) + 50 M$ (2010,2011,2012) + 100 M$ (KEKB for 4 years) + 30 M$ (overseas) + 40 M$ (???) = 250 M$ J.P.Delahaye/CERN : ICHEP2010
Belle disassembling KEKB disassembling 2014
KOTO: K-Rare Decay at J-PARC in May
BEPCII BESIII data taking status & plan BESIII data taking status & plan
Confirmation of BESII observation : pp threshold enhancement in J/y decays New resonances in BESIII : X(2120) and X(2370) in J/y gh’pp Confirmation of BESII observation : X(1835) in J/y gh’pp
BESIII Collaboration 326 members, 46 Institutes, 10 Countries 274 members, 26 Institutes 5 members, 1 Institutes 8 members, 3 Institutes 4 members, 1 Institutes 9 members, 2 Institutes 11 members, 4 Institutes 3 members, 2 Institutes 1 members, 1 Institutes 1 members, 1 Institutes 10 members, 5 Institutes
4. Lepton Physics Project T2K (Tokai to Kamioka) n Experiment
ne Event Selection Under the q13=0 hypothesis, the probability to observe six or more events is 0.007. (corresponds to 2.5 s stat. significance)
q13 measurements d= 0 Chooz experiment 90% CL limit. • 90% confidence level region at d=0 case MINOS (Dm232>0) (Dm232<0)
Near Detector 200m high Reactors 70m high 100m 300m 290m 1,380m Far Detector ~17 GW YongGwang Nuclear Power Plant
Detector Construction & Closing (2011. 1) Near : Jan. 21, 2011 Far : Jan. 24, 2011
Statistical errors • (3 years of data taking with 70% efficiency) Near : 9.83x105 ≈ 106 (0.1% error) Far : 8.74x104 ≈ 105 (0.3% error) Completed RENO Detector (2011. 2) & LS Production • Data-taking is expected to start from August 1, 2011. 43 members, 12 Institutes, 2 Countries Liquid Scintillator Production System T2K DAQ Electronics * Sensitivity : sin2(2q13) > 0.02 MINOS Control Room • Systematic error : <0.5%
Test installation of module Tunnel ( >3 km) construction finished
Daya Bay Collaboration 293 members, 46 Institutes, 4 Countries 182 members (19 Institutes) 4 members (1 Institutes) 6 members (2 Institutes) 101 members (14 Institutes)
World q13Race Sensitivity RENO Time is Money
Improve Precision by 5 (0.1 ppm) Improve Precision by 100
Muonium production (300 K ~ 25 meV 2.3 keV/c) Surface m Ultra Cold m m Linac (300 MeV/c)
ATF STF 5. Energy Frontier Project International Linear Collider Test Facility ATF
The first step of ILC S1-Global 2009 ~ 2011.2.25 Plug compatibility of SCRF system was successfully demonstrated by international collaboration.
LHC Luminosity Upgrade IRQ Development Required for Luminosity Upgrade Luminosity Increase of LHC using Crab Cavities
CLIC J.P.Delahaye/CERN : ICHEP2010 breakdown probability /(m) CLIC – ILC Collaboration ATF Test Facility CLIC
6. Non-Accelerator Physics Project XMASS Dark Matter Search: Xe-loaded Sci. High Scalability 1st 2nd 3rd 1 10 kg ton ton
KamLAND-Zen bb-Decay Search MAJORANA GERDA SNO+ (56kg 150Nd) EXO Xe mixing Xe extraction 1st step : 400 kg 136Xe 2nd step : 1 ton 136Xe (possible to 10 ton)
Jinping underground lab. of Tsinghua Univ. (2500m rock overburden) Main Hall in June 2010 China Dark Matter Experiment
INO : India-based Neutrino Observatory 50 kton magnetized iron module(s) with 30,000 channel RPC 1000 m
7. Summary Nadeshiko To World port &