370 likes | 610 Views
HYDROLOGIC FIELDWORK. MANUAL STAGE GAGE INSTALLATION AND MAINTENANCE TIPPING-BUCKET RAIN GAGE INSTALLATION SURVEYING (LEVELING) E-19 REVISION. MANUAL GAGE INSTALLATION AND MAINTENANCE. STAFF GAGE WIRE-WEIGHT GAGE. STAFF GAGE INSTALLATION. STAFF GAGE INSTALLATION. STAFF GAGE INSTALLATION.
E N D
HYDROLOGIC FIELDWORK • MANUAL STAGE GAGE INSTALLATION AND MAINTENANCE • TIPPING-BUCKET RAIN GAGE INSTALLATION • SURVEYING (LEVELING) • E-19 REVISION
MANUAL GAGE INSTALLATION AND MAINTENANCE • STAFF GAGE • WIRE-WEIGHT GAGE
STAFF GAGE INSTALLATION • GET PERMISSION FROM BRIDGE OR POWER POLE OWNER BEFORE INSTALLING A STAFF GAGE ON THE STRUCTURE. • A WRITTEN APPLICATION WITH DRAWING SHOWING HOW GAGE WILL BE ATTACHED TO THE BRIDGE IS SOMETIMES REQUIRED.
STAFF GAGE INSTALLATION • SURVEY THE GAGE SITE AND DETERMINE THE STAGE AT THE BASE OF THE STRUCTURE (POWER POLE OR BRIDGE PIER). THIS IS THE STARTING STAGE FOR CONSTRUCTING THE STAFF GAGE. • MARK THE STRUCTURE AT A SPECIFIC STAGE. • LINE-UP THE STAFF GAGE WITH THE SPECIFIC STAGE MARKED ON THE POLE OR PIER AND ATTACH IT. EXTEND THE GAGE ABOVE THE FLOOD OF RECORD.
STAFF GAGE INSTALLATION • FOR ATTACHMENT TO A WOOD SURFACE, USE RUST RESISTANT WOOD/LAG SCREWS. • FOR ATTACHMENT TO CONCRETE, DRILL HOLES IN THE CONCRETE AND MOUNT THE STAFF GAGE USING CONCRETE SCREWS (E.G.,TAPCONS). OPTIONALLY, MOUNT THE STAFF GAGE ON A PIECE OF TREATED LUMBER (E.G., 2”X12”) AND MOUNT THE LUMBER TO THE CONCRETE SURFACE USING STEEL ANCHORS AND BOLTS, OR SELF-ANCHORING BOLTS.
STAFF GAGE INSTALLATION • TOOLS NEEDED: • 3/8” DRILL FOR WOOD DRILLING • 3/8” OR ½” HAMMER DRILL FOR CONCRETE DRILLING • WOOD AND/OR CONCRETE DRILL BITS • PORTABLE GENERATOR UNLESS DRILL IS BATTERY POWERED. • SCREWS/BOLTS/WASHERS • SCREWDRIVER AND WRENCH • HAMMER • CARPENTER’S LEVEL
WIRE-WEIGHT GAGE INSTALLATIONOLDER STEEL RAILING WITH VERTICAL POSTS
WIRE-WEIGHT GAGE INSTALLATIONNEWERSTEEL RAILING WITH VERTICAL POSTS
WIRE-WEIGHT GAGE INSTALLATIONCONCRETE RAILING WITH OPENINGIS
WIRE-WEIGHT GAGE INSTALLATION • GET PERMISSION FROM BRIDGE OWNER BEFORE INSTALLING A MANUAL STAGE GAGE ON THE BRIDGE. • A WRITTEN APPLICATION WITH DRAWING SHOWING HOW GAGE WILL BE ATTACHED TO THE BRIDGE IS SOMETIMES REQUIRED.
WIRE-WEIGHT GAGE INSTALLATIONCREATE THE BRACKETS – 3/8” OR ½” THREADED ROD
WIRE-WEIGHT GAGE INSTALLATIONDRILL HOLES IN GAGE FOR THE BRACKETS
WIRE-WEIGHT GAGE INSTALLATION • INSTALL A SAFETY RAILING IF THE BRIDGE RAILING IS LESS THAN 39 INCHES HIGH.
SURVEY WIRE-WEIGHT GAGE • HOLD SURVEY ROD ON BENCHMARK OR REFERENCE MARK OF KNOWN ELEVATION.
WIRE-WEIGHT GAGE INSTALLATION • TAKE A BACK SIGHT (BS) READING ON THE SURVEY ROD USING A LEVEL. THIS GIVES YOU THE HEIGHT OF THE INSTRUMENT (HI).
WIRE-WEIGHT GAGE INSTALLATION • HOLD THE SURVEY ROD ON THE CHECKBAR OF THE WIRE-WEIGHT GAGE. • READ THE ROD USING THE LEVEL. SUBTRACT THE ROD READING (FORESIGHT, FS) FROM THE HEIGHT OF THE INSTRUMENT TO GET THE CHECKBAR ELEVATION.
WIRE-WEIGHT GAGE CALIBRATION • SUBTRACT THE ZERO DATUM OF THE GAGE FROM THE CHECKBAR ELEVATION TO GET THE NORMAL CHECKBAR READING FOR THE GAGE. • IF CHECKBAR EL = 742.98 FT AND ZERO DATUM EL = 695.24 FT, THE NORMAL CHECKBAR READING IS 742.98 MINUS 695.24, OR 47.74.
WIRE-WEIGHT GAGE CALIBRATION • SET THE NORMAL CHECKBAR READING BY LOOSENING 2 SCREWS ON LEFT SIDE OF THE GAGE. HOLD DRUM TO PREVENT DRUM FROM TURNING. • REST WIRE-WEIGHT ON CHECKBAR, HOLD DRUM, AND TURN HANDLE UNTIL THE CORRECT CHECKBAR READING OCCURS. • TIGHTEN SCREWS.
WIRE-WEIGHT GAGE CALIBRATION • IF NECESSARY, ADJUST THE HANDLE SO THAT IT EXTENDS TOWARD THE BACK OF THE GAGE. THIS ENABLES THE WIRE-WEIGHT GAGE COVER TO CLOSE.
RAIN GAGE INSTALLATION AT U.S.GEOLOGICAL SURVEY (USGS) GAGE SITES • GET PERMISSION FROM USGS BEFORE ATTACHING EQUIPMENT TO THEIR GAGE SHELTERS. • MAKE SURE THAT THE USGS WILL HOOK UP THE RAIN GAGE TO THEIR DATA COLLECTION PLATFORM (DCP) IF YOU INSTALL THE GAGE.
RAIN GAGE INSTALLATION • 1. One 10 foot long 1 1/2 inch EMT conduit pipe .................. $ 20.49 • 2. One 1.5 inch EMT set screw coupling ............................ $ 1.55 (Note the set screws are just slotted screw driver type) • 3. Two each SS#2 (3/4 – 1 3/4 inch) adjustable hose clamps $ 1.96 • 4. Four each 5/16 x 1 inch hex bolts ................................ $ .56 • 5. Four each 5/16 hex nuts ................................................ $ .24 • 6. Four each 5/16 fender washers ...................................... $ .64 • 7. Two each U bolts with 2" wide opening, 4" deep ....... $ 2.38 • 8. Two each L shaped corner brace 10" x 1-1/4" ....... $ 15.18 • Total cost ........................................................................... $ 43.00