1 / 9

Brentwood Union Free School District

Brentwood Union Free School District. 2006 Bond Referendum Capital Improvement Program Pool Phase, All Alternates. April 19, 2007. Prepared by:. Brentwood UFSD. Pool Phase “Ross House Pool”. Bids have been received from all Contractors and have been evaluated.

sara-casey
Download Presentation

Brentwood Union Free School District

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, All Alternates April 19, 2007 Prepared by:

  2. BrentwoodUFSD Pool Phase “Ross House Pool” • Bids have been received from all Contractors and have been evaluated. • The Architect and CM have reviewed all bids and have conducted Contractor qualification meetings for all apparent low bidders. • The Architect and CM have generated a letter of recommendation to the District for each qualified low bidder associated with the project. • The Board of Education has awarded the Pool project. • Kick-off meetings to be set up.

  3. BrentwoodUFSD Alt. G-1 New Changing Area and Storage Room

  4. BrentwoodUFSD Alt. G-2 Spectator Seating Area Expansion

  5. BrentwoodUFSD Alt. G-3 Diving Area

  6. BrentwoodUFSD Alt. G-4 Replace Entire Existing Roof

  7. BrentwoodUFSD Alt. G-5 Ceramic Wall Tile At “Project East” Wall

  8. BrentwoodUFSD Alt. G-6 Ceramic Tile At “Project North” Wall

  9. BrentwoodUFSD Alt. G-8 New Ceiling and Floor at Vestibules

More Related