First wall mods status. Points at 0, 30, 60 degrees from Art Points x 1.025 in cross sections RF launchers bigger issue than trim coils. NCSX SIT Meeting July 1, 2002. Model. Vessel with insulation. RF launcher locations, typ 6 places. FW panels, 360 deg shown.
E N D
First wall mods status • Points at 0, 30, 60 degrees from Art • Points x 1.025 in cross sections • RF launchers bigger issue than trim coils NCSX SIT Meeting July 1, 2002
Model Vessel with insulation RF launcher locations, typ 6 places FW panels, 360 deg shown Modular coil partial assembly
Plan cross section 60 deg 50 deg 40 deg RF launcher locations 30 deg 20 deg 10 deg Trim coils 0 deg
Cross section at 0 degrees • Trim coils intersect this section • Almost all points are inside first wall
Cross section at 10, 20 degrees • Points not available yet • Trim coils intersect 10 deg section 10 deg 20 deg
Cross section at 30 degrees • Trim coils do not intersect this section • Closest approach to first wall
Cross section at 40, 50 degrees • Points not available yet • RF launchers intersect these sections Co-ax Faraday shield 40 deg 50 deg
Cross section at 60 degrees • Field joint and limiters are around this section • RF launchers on either side • Almost all points are inside first wall
Cross section at 60 degrees • Cross section changes abruptly • Limiter visible in this view • RF launchers on either side of this section mostly hidden by limiter limiter
RF launcher options • Reduce number of launchers to 4 instead of 6 per section • Less power?, unless strap lengths can be increased • Reduce coax to 4 inches instead of 6, maybe smaller • Move feeds farther out by running strap through “tunnels” to get straight-in shot at feed, but need more than 3 cm behind FW in these areas.
Plasma Panel installed Panel ass’y retracted Thermally insulated connection to vessel Heated / Cooled Rib Vacuum vessel PFC panel / rib detail • Details for one concept for panel attachment developed with BFG Aerospace