1 / 13

Project Presentation E9501: Electrical Power Network Instructor: Javad Lavaei Xiangying Qian

Project Presentation E9501: Electrical Power Network Instructor: Javad Lavaei Xiangying Qian xq2120@columbia.edu. Background Knowledge Optimal Power Flow (OPF) Loads are given Each Generator has a cost function (random and nonlinear -> piecewise linear in practice)

sara-landry
Download Presentation

Project Presentation E9501: Electrical Power Network Instructor: Javad Lavaei Xiangying Qian

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Presentation E9501: Electrical Power Network Instructor: JavadLavaei XiangyingQian xq2120@columbia.edu

  2. Background Knowledge • Optimal Power Flow (OPF) • Loads are given • Each Generator has a cost function (random and nonlinear -> piecewise linear in practice) • Minimize total generation cost to meet physical, operational and network constraints: Active power balance equations Reactive power balance equations Active and reactive power generation limits Power flow limit of lines From and to side bus voltage limits … … • The optimal prices in a transmission network are resulting from an OPF performed by a centralized dispatcher, e.g. independent system operator (ISO)

  3. Background Knowledge • Unit Commitment (UC) , Security-Constrained UC (SCUC ) • Find the least-cost dispatch of available generation resources (units) to meet the electrical load [1]. • Apart from the cost of running these units, we have additional costs and constraints: start-up cost/shut-down cost/ spinning reserve/ ramp-up time ... • So we CANNOT just flip the switch of certain units and use them arbitrarily! • We need to think ahead (say, 24hr before), based on the forecasted load and unit constraints, determine which units to turn on (commit) and which ones to keep down. • Intuitive solution: go over all combinations of choice from hour to hour, for each combination at a given hour, solve the economic dispatch and pick the combination with lowest cost. -> Impossible for large-scale power network! • Deal with discrete decision variables -> possible approaches: Lagrangian relaxation, interior point method …

  4. Background Knowledge • Semi-definite Programming (SDP) • Minimize a linear function subject to the constraint that an affine combination of symmetric matrices is positive semi-definite [2]. • SDP unifies several standard problems (e.g. linear and quadratic programming) and finds many applications in engineering and combinatorial optimization. • Standard form of SDP: Primal: Dual:

  5. Background Knowledge • Compressed Sensing (CS) • CS theory asserts that we can recover certain signals from far fewer samples or measurements than traditional Nyquist rate requires [3]. • Relies on “Sparsity” and “Incoherency” • ( is the information signal , is the sensing waveforms, is the measured signal ) • Ideally, we would like to measure all N coefficients of , but we only get to observe a subset of these , where . • The process of recovering from is ill-posed/underdetermined, as there are many candidate signals consistent with the data. • Can recover the signal by -norm minimization, that is, among all candidate signals we pick the one whose coefficient sequence has minimal norm.

  6. Background Knowledge • -norm Regularization • Sparsity-inducing norm to convex optimization • Consider the convex optimization problem of the form [4]: where : is a convex differentiable function; : is a sparsity-inducing, typically non-smooth, non-Euclidean norm. • When we know a priori that the solutions only have a few non-zero coefficients, is often chosen to be -norm : . • This means the recovery via minimization is provably exact when information signal is sufficiently sparse. • Regularizing by -norm is known to induce sparsity in the sense that, a number of coefficients of , depending on the strength of the regularization (), will be exactly equal to zero.

  7. Related Work • Semi-definite programming-based method for SCUC with operational and optimal power flow constraints [5] (by X. Bai, H.Wei, IET Generation, Transmission & Distribution) • Apply SDP model to the SCUC problem and solve it efficiently using interior-point method. • When the solution contains minor mismatches in the integer variables, a simple rounding strategy is used to correct non-integers into integers. • The simulations on 6 to 118 bus networks over a 24hr period show the proposed method is capable of obtaining optimal UC schedules without breaking any constraints and minimizing operation cost at the same time. • Indicate SDP sparsity technique and new round strategy for non-interger variables as the future work. • However, not penalize the relaxation of discrete variables in the objective.

  8. Motivation and Goal • Use SDP to solve OPF for a small scale transmission network; incorporate -norm regularization into the objective function so as to obtain sparse OPF solutions. • Motivation • Each generator has a high startup cost () described in [6] as $/hr ( turbine startup cost; boiler startup cost; startup maintenance cost; number of hours down; boiler cool down coefficient ) • Because the startup cost function has a jump and discontinuous characteristic, OPF just ignores it for simplicity. • It is better to operate the grid with as few generators as possible when taking the market into account. • Having sparse solutions of OPF is helpful to decide unit commitment.

  9. Motivation and Goal • Look at the problem from two respects: • Assume the generation cost is given, find the effectiveness of sparsification induced by -norm regularization on power, as increases from 0 to infinity. • Assume the generation cost is not important, find a minimum number of generation resources that satisfy all operational and network constraints. • Set up an appropriate startup cost for each generator. • The comparison and evaluation is based onminimizing the Total Generation Costs + Total Startup Costs.

  10. Current Progress • Source data: • IEEE 14-bus • Method: • Formulate SCOPF as primal problem of SDP, then solve it using existing SDP solvers such as “Sedumi”. • Simulation Tools: • Matlab R2011a, MATPOWER, CVX, Yalmip • Preliminary Results: • From the first perspective, I use the given quadratic cost functions, but cannot observe the benefit of sparsification by changing . • From the second perspective, I can observe sparsifiedsolutions to the power by setting random cost vector. So I can seek for a minimum number of generation units that satisfy all operational and network constraints.

  11. Problem Solving and Future Work • Possible solutions to the unexpected results: • Add more generators into the network. • Use all linear cost functions instead. • Tune the bus voltage limits. • Increase the upper bounds on generators. • Since randomly-picked linear cost vector of the generators results in a sparse solution for current 14-bus network, I will extend it to the IEEE 30-bus network and do some comparison. • Another way to solve SDP is from the dual perspective. I will learn more about the dual OPF.

  12. References [1] http://en.wikipedia.org/wiki/Power_system_simulation [2] Vandenberghe L., Boyd S., Semidefinite Programming, SIAM REVIEW, 1996, 38, pp. 49-95 [3] Emmanuel J. Candes, Michael B. Wakin, An Introduction to Compressive Sampling, IEEE SIGNAL PROCESSING MAGAZINE, Mar. 2008 [4] Bach F., Jenatton R., Mairal J., Obozinski G., Convex Optimization with Sparsity-Inducing Norms, available at: http://www.di.ens.fr/~fbach/opt_book.pdf [5]X.Bai, H.Wei, Semi-definite programming-based method for SCUC with operational and optimal power flow constraints, IET Generation, Transmission & Distribution, Apr. 2008 [6] Padhy N.P., Unit Commitment – A Bibliographical Survey, IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19, pp. 1196-1205

  13. The end! Thank you ! XiangyingQian xq2120@columbia.edu

More Related