Contractors’ Outreach Meeting August 31, 2005. Introductions. Janet Adams SFOBB East Span Project Manager, Caltrans. Welcome. Bijan Sartipi District 4 Director, Caltrans. Welcome. Olivia Fonseca Deputy Director Civil Rights Program and Small Business Advocate.
E N D
Contractors’ Outreach Meeting August 31, 2005
Introductions Janet Adams SFOBB East Span Project Manager, Caltrans
Welcome Bijan Sartipi District 4 Director, Caltrans
Welcome Olivia Fonseca Deputy Director Civil Rights Programand Small Business Advocate
SFOBB Self-Anchored Suspension Span Contract Janet Adams SFOBB East Span Project Manager, Caltrans
East Span Seismic Safety Replacement Project San Francisco - Oakland Bay Bridge
Contract 04-0120F4 • This contract constructs the self-anchored suspension portion of the new East Span • Advertised on 8/1/05 • Bids open on 2/1/06 • Estimated cost is $1,450,000,000 • Project funded by Toll revenues and State funds, therefore Buy America is not required • Contract duration is 2130 working days (7 days/week)
Contract 04-0120F4 • Contract consists of the following components: • Two steel orthotropic box girders and decks • Steel tower consisting of 4 tower shafts with elevator • Concrete cap beam at Piers W2 and E2 • Steel bike path • Steel prefabricated parallel wire strand cable system • All steel fabrication will be off-site
District Contracts Bob Finney Deputy District Director - Construction
80 580 29 12 37 1 101 101 North CountiesUpcoming Projects Napa 29 - St Helena Roadway Rehabilitation Napa 121 – Replace Tulucay Bridge SON 101 Steele Ln IC Son 101 HOV SR 12 – Steele Ln Mrn 101 Blithedale Off-Ramp Mrn 580 RSR - Polyester Deck Overlay Mrn 101 HOV Central San Rafael
Richmond San Rafael BridgePolyester Deck Overlay 041521 CompleteBridge Deck Overlay, Deck joint Cost: $18.6 MAdv: Dec. 2005
Marin 101 HOV Gap Closure Central San Rafael 226151 Mrn 101 HOV Widening Central San Rafael Cost $42.5 M Adv: Oct. 2005
N 131 101 East BlithedaleOff Ramp 2937U1 Mrn 101 E. Blithedale Off Ramp Cost $5.8 M Adv: Feb. 2006
N 29 128 128 29 Napa 29 St. HelenaRoadway Rehabilitation Project Limit – Bale Lane • Rehabilitate Roadway : • Curve Improvements • Super elevation Correction • Shoulder Widening • Drainage Modification • Digout and AC Overlay 128471 Napa 29 Pavement Rehabilitation Cost: $4.7 M Adv: Sept. 2005 St Helena Project Limit – York Creek Bridge
N 12 12 101 101 Sonoma 101 HOV Widening Route 12 - Steele Lane Auxiliary Lane - Steele Lane - College Avenue Route 101 Widening Bicentennial Way - Earle Street OC College Ave. Bridge Replacement and I/C Modification Santa Rosa 6th Street New Undercrossing 4th Street Bridge Widening Santa Rosa Creek Replace Bridge Soundwall Route 12 / 101 I/C Ramp Modification 245411 Son 101 HOV Route 12 to Steele Lane Cost: $52.1 M Adv: Sept. 2005
N 101 101 Sonoma 101 HOV WideningSteele Lane IC N Route 101 Widening Cleveland - Edwards Avenue Soundwall Steele Lane Off Ramp Relocation Steele Lane NB On Ramp Metering Santa Rosa Steele Lane Bridge Widening 263901 Son 101 HOV Steele Lane I/C Cost: $12.4 M Adv: Sept. 2005
280 80 680 87 92 82 1 84 101 101 San Francisco, San Mateo and Santa Clara Counties Projects SF 101 Presidio Viaduct SF 80 SFOBB Resurface Upper & Lower Deck SM 101 Auxiliary Lane Devil’s Slide Tunnels SCl 101 Grind PCC Pavement SCl 680 Median Barrier
80 80 N 0105U1 – Overlay SFOBB Upper/Lower Deck • Resurface SFOBB : • ¾” Polyester Deck Overlay • Grind ¾” Existing Epoxy Asphalt • Lower Deck - Replace 9 Expansion Joints Project Limits – YBI Project Limits – SFO SFOBB Anchorage 0105U4 SFOBBResurface Upper and Lower DeckCost: $25.0 MillionAdv: 8/29/05
SF 101 - Presidio Viaduct Rehabilitation and Repaint 449404 Rehab and Paint Presidio Viaduct Cost: $19.6 MillionAdv: Dec. 2005
280 N 82 82 101 101 101 SM 101 Auxiliary Lanes Project Limits – Millbrae Avenue • Auxiliary Lanes : • NB and SB Auxiliary Lanes • Reconstruct Peninsula OC • Monte Diablo Ped. Bike OC • Soundwall and Retaining Wall • Drainage Improvements Project Limits – E 3rd Avenue 264201 SM 101 Auxiliary Lanes 3rd Ave – Millbrae Ave. Cost: $74.2 M Adv: June. 2006
N Devil’s Slide Tunnels and Approach Roads South Portal Tunnels New Roadway North Portal Bridge Operation Maintenance Center South Rock Cut 1123U1 Devil Slide – Construct Tunnels Cost: $225.0 MillionAdv: Apr. 2006
880 680 880 280 N 237 237 87 82 82 101 101 101 101 0C890 SCL 101 Grind PCC Pavement Project Limits – San Mateo County Line • Grind PCC Pavement : • Grind PCC Pavement • Slab Replacement • AC Overlay Mainline & Ramps • Fog Seal Shoulders 0C8901 SCl 101 Grind PCC Pavement Cost: $19.9 M Adv: 8/15/05 Project Limits – Quadalupe River Bridge
680 880 880 680 680 280 N 87 232 101 101 SCl 680 Upgrade Median Barrier Project Limits – Alameda County Line • Upgrade Median Barrier : • Replace MBGR w/ Concrete Barriers • Minor Drainage Modifications 270511 SCl 680 Upgrade Median Barrier Cost: $13.7 M Adv: Sept. 2005 Project Limits – I 280 / 101 IC
80 680 4 24 Contra Costa CountyUpcoming projects Benicia Martinez Bridge Carquinez Bridge CC 80 Westbound HOV Lanes Antioch Bridge Richmond San Rafael Bridge CC 680 Auxiliary Lanes
80 80 4 I 80 WB HOV Extension CC4 - Cummings Skyway I/C Modification I 80 Widening 263701 CC 80 Extend WB HOV SR4 - Cummings Cost: $19 M Adv: Oct. 2005 I/C Modification Auxiliary Lanes I/C Modification
680 680 N Construct Auxiliary LanesDiablo Road - Bollinger Canyon Road Project Limits – Diablo Road. Project Limits – Sycamore Valley Rd. • Construct Auxiliary Lanes: • NB And SB Auxiliary Lanes • Relocate Existing Soundwalls • Widening Laurel Drive UC • Retaining Walls Project Limits – Crow Canyon Rd. 228551 CC 680 Construct Auxiliary Lanes Cost: $15.2 M Adv: Nov. 2005 Project Limits – Bollinger Canyon Rd.
80 880 580 680 238 84 92 Alameda CountyUpcoming Projects Distribution Struct. Retrofit MacArthur Blvd. On Ramp SF Oakland Bay Bridge 5th Avenue IC Retrofit High Street IC Retrofit I 580 PCC Pavement Rehab. I 238/580 Widening and Rehabilitation SR 84 Pigeon Pass Realignment San Mateo Hayward Bridge Dumbarton Bridge
Ala I 80 / 580 / 880Distribution Structure Retrofit - Utility Corridor 143554 Retrofit I 80/580/880 Distribution Structure Cost: $13.2 M Adv: Dec. 2005
N Alameda 880 - 5th AvenueInterchange Retrofit Project Limits – Oak Street • Replace Existing Structure: • Maintain Existing Capacity • Raise Profile of New Structure • Auxiliary Lane, from Oak St. Off Ramp • Standard Shoulders • Bike and Pedestrian Lane • Lake Merritt Channel Project Limits – 10th Avenue 1706U4 Ala 880 – 5th Avenue Interchange Retrofit Cost:$102 MillionAdv: Aug. 2006
N Alameda 880 - High StreetInterchange Retrofit Project Limits - Fruitvale Avenue • Replace Existing Structure: • Maintain Existing Capacity • Reconfigure SR 77 / 42 Ave./880 IC- Partial diamond w/ at grade intersection • Reconstruct Frontage Road: • - Oakport Street • - E. Eight Street • Standard Shoulders • Bike and Pedestrian Lane Project Limits- .9 km S. of High Street 165424 Ala 880 – High Street Interchange Retrofit Cost:$60.7 Million Adv: Sept. 2006
880 880 238 238 580 N I-238 Widening and Rehabilitation I-238/580 IC to I-238/880 IC Project Limits – I-238/580 IC Project Limits – I-238/880 IC • Widening and Rehabilitation: • Widen I-238 from 4 to 6 Lanes • Rehabilitate I-238 with LLP • SB I-880 Aux. Lane from I238/880 IC to A Street Off Ramp • Widen NB I-880 to I-238 to 2-Lanes • Widen NB I-238 to I-880 to 2 Lanes 249041 I-238 Widening and Rehabilitation Cost: $82.4 M Adv: Jan. 2006 Project Limits – A Street
580 680 238 880 580 N PCC Pavement RehabilitationHacienda Drive - I 238 • Upgrade Existing Pavement : • Replace Cracked Slabs • Grind All Lanes • Repair Shoulders • Replace Approach Slab • AC Overlay Ramps • Rehab Bridge Decks • Install Bridge Rails Project Limits – Hacienda Dr. Project Limits – I - 238 284311 Ala 580 PCC Pavement Rehab Cost: $28 M Adv: 8/8/05
580 680 680 680 580 N 84 84 238 State Route 84 RealignmentPigeon Pass Dublin Pleasanton Livermore • Roadway Realignment : • Improve Horizontal / Vertical Alignment • Median Buffer • Current Design Standard • Standard Outside Shoulder • Guardrail • Steep Terrain • Environmental Sensitive Habitat Project Location 172401 Ala 84 Roadway Realignment Cost: $21.3 M Adv: Aug. 2006
Networking Network session