1 / 29

Implementation of STOP for Supervisors - PDO & Contractors

Implementation of STOP for Supervisors - PDO & Contractors. ALI H. ALMAHROOQI CSM/72 CORPORATE FOCAL POINT OF STOP. OFFICE LOCATION MAF GN074. Implementation of STOP for Supervisors - PDO & Contractors. SCHEDULE: 0800 STOP IMPLEMENTATION 0930 BREAK 0940 ADMINISTRATORS & LEADERS GUIDE

RexAlvis
Download Presentation

Implementation of STOP for Supervisors - PDO & Contractors

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Implementation of STOP for Supervisors - PDO & Contractors ALI H. ALMAHROOQI CSM/72 CORPORATE FOCAL POINT OF STOP. OFFICE LOCATION MAF GN074 FAHUD ORYX

  2. Implementation of STOP for Supervisors - PDO & Contractors SCHEDULE: 0800 STOP IMPLEMENTATION 0930 BREAK 0940 ADMINISTRATORS & LEADERS GUIDE 1000 UNIT ONE - INTRODUCTION 10:35 BREAK 10:45 GROUP DISCUSSION 11:45 STOP DATA BASE 12:15 CLOSE FAHUD ORYX

  3. Implementation of STOP for Supervisors - PDO & Contractors Implementation Workshops Objectives: • Understand the STOP objectives • Develop working knowledge of STOP techniques • Understand how to implement STOP in your Asset Team or Company This is NOT a STOP course and there isn’t any. FAHUD ORYX

  4. Implementation of STOP for Supervisors - PDO & Contractors Current HSE problems identified in PDO and Contractor operations:(STOP will help in these areas) • Near miss reporting: hardly exists • Blame/fear culture at workforce and higher levels • Hazard identification skills could be better • Communication skills: talking TO instead of WITH • Gaps in the “Line Management of Safety” • Inspections: looking at things/conditions rather than at people and their behavior FAHUD ORYX

  5. What is: For Supervisors STOP is: • To be driven by Line management • A behaviour program • Teaches hazard identification by observation • Teaches how to speak WITH people • Based on “NO BLAME” • Teaches “Coaching” • A way of life FAHUD ORYX

  6. What is: For Supervisors STOP is NOT: • A course you can attend • A program for “safety advisors” • An administrative burden • The answer to all our problems • A quick fix FAHUD ORYX

  7. Target Zero in PDO As of 28/06/02 LTIF versus Fatality frequency over the years 92 93 94 00 02 98 LTI frequency (LTI/million hrs) 97 95 01 96 2002-Target 99 Zero Fatality frequency (Fatalities per million hrs) FAHUD ORYX G:\CSM\Csm4_NEW\Csm151\Boards graphs\STOP ali mahrooqi.ppt

  8. As of 28/06/02 Fatal accidents 1989 - 2002Overall (PDO & Contractors) FAHUD ORYX G:\CSM\Csm4_NEW\Csm151\Boards graphs\STOP ali mahrooqi.ppt

  9. For Supervisors Who is a targeted Who is a “STOP supervisor”? • Contractors and PDO • All management and supervisory levels:MD down to Foreman (possibly include operators) • Those who directly manage safe execution of work • Those who are involved in the safe execution of work • In PDO: some 800 - 1,200 staff • Could be extended to all PDO staff (?) FAHUD ORYX

  10. Implementation of How is it implemented ? • Self-training cascading from the top down • 7 training/practice units each with: • Self study workbook (45-60 min) • 2 Group discussions led by team leader • 10 min Video • On the job application • Next unit after all have completed current unit • 2 weeks per unit • 14 weeks for full program FAHUD ORYX

  11. Implementation of Training Cascade example: • Managing Director leads: Directors • Directors lead: Team Leaders • Team Leaders lead:Supervisors • Supervisors lead: Foremen FAHUD ORYX

  12. FAHUD ORYX

  13. FAHUD ORYX

  14. FAHUD ORYX

  15. FAHUD ORYX

  16. FAHUD ORYX

  17. Implementation of • Training Period • Consider Shifts • Availability of Managers • Commitment • Get Managers to Commit • Discuss with them the benefits of STOP • Duration Stick to the timing. • Implement training cascade: drip feeding • 7 units • 2 weeks/unit (not faster) • 2 units/month for interior staff (1/week during ON shift) FAHUD ORYX

  18. What is: For Supervisors STOP: Safety Training Observation Programdeveloped by DuPont (ex gunpowder manufacturer, now chemicals giant) STOP: a safety BEHAVIOR programdriven by line management STOP: by changing behavior you will change ATTITUDE FAHUD ORYX

  19. What is: For Supervisors • Supervisor makes frequent STOP safety observation tours • Uses the 5-step “observation cycle” • Reports on STOP card (and database) • STOP-cards feedback used with local team during every safety meeting and tool-box talk • STOP database used to to manage large number of cards and analyse trends FAHUD ORYX

  20. The 5 step STOP safety observation cycle Decide Report STOP Act Observe What is: For Supervisors FAHUD ORYX

  21. What is: For Supervisors 5 Step Observation cycle • DECIDE: To do a STOP tour • STOP: Near people working • OBSERVE: People in systematic manner (STOP card = aid-memoir) • ACT: Talk WITH person in order to - Correct immediately - Prevent recurrence • REPORT: On STOP card and database FAHUD ORYX

  22. What is: For Supervisors DECIDE: To make a STOP observation/tour • Important step • To make a decision to think about safety • To set aside time for a safety observation tour FAHUD ORYX

  23. What is: For Supervisors STOP: Near people working • Do not just walk past and throw a quick glance • Take a position where you can observe without interfering with the ongoing work FAHUD ORYX

  24. What is: For Supervisors OBSERVE: People in systematic manner • Reaction of people • PPE • Position of people • Tools and Equipment • Procedures (adequate, known, followed) • Housekeeping standard • Duration: 1/2-2 min (not too long!) FAHUD ORYX

  25. What is: For Supervisors ACT: Talk WITH the person • Questioning open attitude • Try to find the root cause • Always give feedback (rewarding or correcting) • Identify immediate corrective • Identify action to prevent recurrence FAHUD ORYX

  26. What is: For Supervisors REPORT/RECORD: On the STOP card • Tick categories • Unsafe act observed • Immediate corrective • Action to prevent recurrence • Your name and date • “Report” goes to database and is used in local area safety meeting FAHUD ORYX

  27. Implementation of Feedback from 10 past implementation workshops 169 staff attended (120 PDO, 49 Contractors): • Back to basics, Simple, Structured • No Blame, Constructive • Common values, Changes attitude • Concentrates on people and 1 to 1 Communication • This will work, Promising • Very good program FAHUD ORYX

  28. Implementation of Implementation Challenges: • All to commit unconditionally: top to bottom • Keeping out blame and disciplinary action • Database will be miss-used: competition/blame • Getting all the contractors on board • Keeping it alive after 6 months • Resistance, flavor of the month • More work and administration • Capture all staff: # those on leave need to catch up # new staff need full induction FAHUD ORYX

  29. Implementation of What went wrong in other Shell OU’s: • 1/2 day Course by trainers (Gabon, PDO: PSAP) • Not all attended (Gabon: 60%) • Managers not committed, not trained (Gabon) • Link to other systems unclear (near miss report) • Wrong culture: too American (Australia) • Ran out of STOP cards for 3 weeks Message: • Implementation team • “TOP CLASS” Implementation plan required • Absolute commitment by all FAHUD ORYX

More Related