WP 8.6.2 Common DAQEmlyn Corrin, Vincent Boudry17 February 2011
Common DAQ • How to integrate different DAQs • “Umbrella DAQ” – EUDAQ? • Data format • LCIO? • Should keep raw data • Running modes • ILC-like (train triggerless) /Pseudo-ILC (train+trigger) / Classic • Common API to CERN and DESY beam data Some Issues
Existing flexible and user-oriented DAQ • Adapt EUDAQ to new beam telescope • MimosaProducer for NI readout • Tagging mode for triggers • Improved online monitoring • Look into integration with other DAQs EUDAQ
Early mini-TLU (<€1000) by May,then full TLU later Compatible with EUDET TLU & CALICE BIF(with CALICE-specific firmware) Use new connector (FMC), Xilinx SP601 host HDMI for DUT connectionswith dongle for LVDS/RJ45 or TTL/LEMO Gigabit Ethernet (IPBus) for sending timestamps etc. AIDA-TLU
All hardware available Software: XDAQ Full web interface, prototype Qt interface Will go to testbeam in July 2011 CALICE DAQv2
ODR based on PLDA XPressFX100 • ODR vs Ethernet card • Deliverables: • Extend TLU (with Bristol) • CALICE BIF card (with LLR, LAPP, Bristol) • Adapt CALICE ODR for Common DAQ RHUL
Follow CALICE DAQ system • Zero level DAQ by July 2011: data collection and transmission to DIF board • DIF H/W and F/W prototype based onXilinx evaluation board, for July 2011 • LDA & ODR adapted from CALICE,work ongoing over summer 2011 • DAQ adapted from CALICE: 2012 and later • AIDA calorimeter prototype • Flexible tungsten absorber • Power pulsing • Include LumiCal alignment system DAQin global testbeam DAQ system FCAL
Hardware based on ALICE TPC • Standalone DAQ with ALICE drivers/libraries(same as for EUDET/LTPC) • No common DAQ interface or TLU/DBOX trigger • Modifications needed: • New “Front End Card” • New backplanes • MCM instead of FEC • Timescale: H/W and S/W by September 2013 • Implement common server to interfacebetween local DAQ and common control S-ALTRO + LCTPC
Set up regular meetings: • Remote every 2 months • Physical every 6 months • 1st deliverable for M20 (Oct 2012):Definition of technical characteristics for common DAQ infrastructure • Compatibility of EUDAQ and CALICE DAQ • Develop hardware part of DAQ • System interfaces to existing LC detector systems • Extend readout to high fluxes Tasks for 2011