1 / 7

For Cochise County Final Public Hearing – Adopt Resolution April 9, 2013

Arizona Department of Housing FY 2013 Community Development Block Grant Funding Cycle (CDBG). For Cochise County Final Public Hearing – Adopt Resolution April 9, 2013. CDBG Overview .

scout
Download Presentation

For Cochise County Final Public Hearing – Adopt Resolution April 9, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Arizona Department of HousingFY 2013 Community Development Block Grant Funding Cycle (CDBG) ForCochise CountyFinal Public Hearing – Adopt ResolutionApril 9, 2013

  2. CDBG Overview • Cochise County is expected to receive approximately $170,000 in State Community Development Block Grant (CDBG) funds from the Arizona Department of Housing. • Two Public Hearings and one Work Session have been held to discuss eligible projects for the upcoming grant cycle. • Three projects qualify as high priority for funding based on CDBG and HUD criteria. Each of the projects could use all or partial funding. The County can submit up to three applications although HUD guidelines encourage funding projects fully to provide for a minimum five year life span. • The grant provides for up to 18% administrative costs to oversee the projects.

  3. Projects for Consideration • Emergency Home Repair Program - $170,000 $144,080 + $25,920 admin cost Home repair grants managed through the Cochise County Housing Authority in amounts up to $25,000 for a minimum of 5 owner occupied homes in the unincorporated areas of the County. Program in existence since 1998.

  4. Projects for Consideration • Elfrida Water District Improvements $132,000 120,000 + $12,000 admin cost Upgrades to water district equipment that is over 60 years old. Improvements could include cleaning and deepening an existing well, installing a new 50,000g water tank, and providing a back up generator.

  5. Projects for Consideration • Bowie Water District Improvements $129,000 $117,000 + $12,000 admin cost Upgrades to the water district equipment that is over 75 years old. Improvements could include electrical repairs, replacement of mainline, pvc piping, a utility truck, waste water pump and replacement of meters and hydrants.

  6. Project Breakdowns Elfrida Water Dst. Clean Existing well/deepen $23,000 50G Tank $72,000 Generator $25,000 Bowie Water Dst. Emergency Home Repair 5 + homes Up to $25,000 in repairs each home Electrical Repairs $18,000 Main line $33,000 Pvc $3,000 Replace pump $28,000 Hydrants/Meters $20,000 Utility Truck $15,000 $144,080 $120,000 $117,000 + 18% in admin costs

  7. Public Input QUESTIONS ? ? ? ? ?

More Related