Experiment #5: Protein Separation Project. Michael Eatmon Sarah Katen Nell Keith Monica Sanders. Introduction. Project Description and Goals (1). Scale-up of chromatography column used to separate a mixture of bovine hemoglobin and bovine albumin

season
Download Presentation

Experiment #5: Protein Separation Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Experiment #5: Protein Separation Project Michael Eatmon Sarah Katen Nell Keith Monica Sanders

  2. Introduction

  3. Project Description and Goals (1) • Scale-up of chromatography column used to separate a mixture of bovine hemoglobin and bovine albumin • Batch process – specified amount of protein loaded on to column for each run • Required to process 50,000 liters/year of a mixture of 6.0 g/liter albumin and 4.0 g/liter hemoglobin

  4. Project Description and Goals (2) • Total Capital Investment (TCI), cash flow, and profit of project will be evaluated • Selling price of hemoglobin is $700 per kg • Selling price of albumin is $500 per kg

  5. Methods Considered • Method #1: Purchase a single large column and run batches only on this column – lowest initial investment, but greater up-time and operating costs. • Method #2: Purchase multiple columns and only run one batch per day per column – highest initial investment, but lowest operating costs. • Optimum method between these extremes

  6. Theory

  7. Theory (1) • Anion exchange chromatography – resin is a weak base and attracts negative ions when it is mixed when mixed with a solution at a pH below its pK (~10) • TRIS-chloride buffer used b/c TRIS is neutral and will not interact with the resin • Salt dissolved in TRIS buffer to cause proteins to desorb • Components in stationary phase move down the column more slowly than those that dissolve in the mobile phase

  8. Theory (2) Image courtesy of http://www.cartage.org.

  9. Theory (3) • Isoelectric point = pH at which net charge per amino acid is zero • Isoelectric point bovine hemoglobin = 6.8 • Isoelectric point bovine albumin = 4.7 • Bovine albumin will come out of the column first because it is less charged in the buffer solution and has a lower affinity for the resin.

  10. Theory (4) • Column regenerated between runs by washing it with NaOH at pH of 14 to remove biological compounds adsorbed to resin. • Resin stored in 20% ethanol to prevent drying

  11. Theory (5) • Pressure drop monitored to determine if column is appropriate for scale up • Column length limited by pressure drop • Calculated with the Darcy Equation

  12. Theory (6) • Need superficial velocity and Blake-Kozeny constant to get the pressure drop.

  13. Design Plan

  14. Design Plan (1) • For scale-up, resolution is held constant • Resolution of proteins in linear gradient elution ion exchange chromatography:

  15. Design Plan (2) • To remove the volume terms in this expression, we define

  16. Design Plan (3) • Substituting into previous equation gives

  17. Design Plan (4) • For scale-up purposes, the diffusion coefficient and column void fraction will be the same for the pilot and scaled-up design

  18. Design Plan (5) • As particle size increases, either Qor dp must decrease while the other is held constant • The same resin and particle size will be used for the scaled-up design • This gives:

  19. Pressure Drop Restrictions • The column height can be changed along with the linear velocity using the normalization between the two in order to meet pressure drop restrictions. • When the flow rate is kept constant, the pressure drop decreases as column diameter increases

  20. Scale-up Plan (1) • In this experiment, desired elution flow rate is not given; the desired production is given in throughput • The scale-up relationship can still be used as we know that throughput is proportional to elution flow rate

  21. Scale-up Plan (2) • The desired throughput is divided by the pilot throughput to get a scale-up factor (SUF) that will be used to determine the scaled-up column volume • With the new volume, a scaled-up column height (L) may be determined using prefabricated column diameters as specified by manufacturers

  22. Optimization • In order to optimize the system, several diameters may be considered to find the most favorable system that will meet pressure drop restrictions. • Also, the number of columns and batches per day will be variables in scale-up optimization.

  23. Experimental Plan

  24. Experimental Plan (1) • The major variables in the system are: • the rate of change of the salt gradient • the final salt concentration within the column • the gradient elution velocity • the amount of protein loaded into the column over a given amount of time.

  25. Experimental Variables (1) • First variable - rate of change of the salt gradient • Depends on elution volumes used • Lower volume gives more rapid rate of change • Different proteins elute at different salt concentrations • Too rapid (low volume) – poor or no separation • Too slow (high volume) – high separation time

  26. Experimental Variables (2) • Second variable – final salt concentration • Changing the concentration of NaCl introduced into the system; a higher concentration gives a more rapid rate of change. • Different proteins elute at different salt concentrations • Too high – poor or no separation • Too low – high separation time

  27. Experimental Variables (3) • Third variable – gradient elution velocity • Too fast – proteins wash out in bulk; poor separation • Too slow –separation time too slow for industrial processes

  28. Experimental Variables (4) • Fourth variable – amount of protein loaded into the column over a period of time • Too much – not enough absorbent surfaces to hold protein – poor separation • Too little – requires more time to separate desired throughput – inefficient

  29. Apparatus

  30. Operating Equipment • Bovine albumin and bovine hemoglobin • Bio-Rad econo column • DEAE Sepharose Fast Flow • Bio-Rad econo UV monitor • Bio-Rad gradient former

  31. Operating Procedures • Protein separation column created • Protein loaded onto column • Salt gradient added at feed rate • Salt gradient added at elution rate • Protein separation measured on chart recorder • Regenerate column for next run

  32. Operating Variables • Elution rate and salt gradient varied • Salt gradient volume: 75-100 mL • Elution rate: 3.0-4.0 mL/min • pH ≈ 8.2 • Total cycle time recorded

  33. Safety Hazards • Should be handled in a well ventilated area • The skin should be rinsed 15 minutes upon exposure to the skin • Bovine hemoglobin can irritate the upper respiratory tract causing allergic reactions and asthma

  34. Experimental Results

  35. Protein Separation Trial Runs • 9 different trials • Maximize protein separation as measured by protein peak area ratios • Minimize time between protein peaks • Consistency

  36. Successful Trial Run Conditions

  37. Trial Results • Trial 1: Some separation, protein peaks spread very far apart • Trial 2: Better separation, but peaks too close together • Trial 3: Best separation, very small time between elapsed between peaks • Trial 4-6: Little or no separation, indistinct peaks • Trial 7-9: Incorrect peak formation, no peaks

  38. Trial #1

  39. Trial #2

  40. Trial #3 (run to be scaled-up)

  41. Hemoglobin/Albumin Peak Ratio

  42. Scaled-Up Design

  43. Scale-up Procedure • Scale-up factor (SUF) determined by dividing desired protein throughput per column by pilot throughput • Trial #3 (10/5/04) scaled-up • Assumption of 8-hour workday, 5-day workweek • Assume 20-year project life; construction in 2004, production begins in 2005

  44. Parameters to be Scaled-Up

  45. Process to be Scaled-up • Equilibration with 20 mM TRIS buffer (pH 8.2), 5 bed volumes in 20 minutes. • Load protein • Elute protein to final column concentration of 0.5 M NaCl in 20 mM TRIS, assuming same residence time as pilot scale • Regenerate bed by flooding with: a)  3 bed volumes 1.0 M NaCl in 15 minutes b)  5 bed volumes 1.0 NaOH in 20 minutes c)  3 bed volumes deionized water in 15 minutes d)  3 bed volumes 20 mM TRIS in 15 minutes • Repeat steps 3 and 4 for each run. • Flood column with 20 % ethanol (1 bed volume) in 20 minutes for storage.

  46. Scale-up Procedure (1) • Desired daily throughput divided by arbitrary number of runs per day • Column SUF determined from throughput and applied to pilot column volume to determine scaled-up volume • Prefabricated column specifications used to determine bed height for given diameters

  47. Scale-up Procedure (2) • Scaled-up specs. used to determine superficial velocity and then pressure drop across column, to ensure compliance with column pressure rating • Total cycle time used to determine the number of possible cycles per day • Cycles per day divided by cycles per column per day to determine number of columns for scaled-up design

  48. Scale-up Procedure (3) • Arbitrary number of runs from initial step varied iteratively in order to minimize number of columns for each set of specs. • Economic optimum at point of lowest equipment cost, as further calculations are based on total delivered equipment costs

  49. Scaled-up Process • 4 columns - 35 cm x 50 cm - P<2 bar • Bed volume of 48 L • Three runs per column per day • Daily throughput of 2 kg protein • Gradient volumes per run of 490 L • Elution rate of 20 L/min

  50. Process Equipment • Equipment sized based on scaled-up specifications • Components include chromatography columns, gradient and buffer tanks, fluid pumps, mixers, and tubing • Equipment priced at lowest possible cost while meeting design requirements