An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP 5: Diagnostics Coordinator: Grahame Blair, RHUL Eurotev Open meeting, CERN, 13th September 2004 • Bunch profile • Confocal Resonator Pick-up. • Post Collision Diagnostics • Energy spectrometry • High Energy Polarimetry. • Fast beamstrahlung monitor • Beam Phase Measurement • Wide Band Current Pickup • Precision Beam Position Monitor • Beam tests at CTF3

  2. Output: • Strong groups, collaborating internationally. • Working prototype systems • International test beam work • RAs, technical staff and students gaining • essential experience. • Aim will be to include the work in the ILC design effort.

  3. Simulations with HFSS and GDFIDL. Position sensitive: compare excitation of modes with zero or maximum on the beam axis. Contact: Volker Ziemann CFBPM: Confocal Resonator Monitor • Uppsala University (+ CERN) • Problem: High frequency waveguide modes perturb measurements with short bunches in CTF3. • Objective: Design and test monitor that interacts with the direct quasi-TEM like field of the bunch, but is insensitive to waveguide modes (wakes). • Idea: Laser resonator does not radiate orthogonally to axis. By reciprocity external fields do not couple into resonator. • Solution: Passive confocal resonator monitor perpendicular to the direction of the beam.

  4. LBPM Contact: Grahame Blair • Oxford • RHUL • DESY • UCL • CERN PETRA, ATF → Global Collaboration Possible use of GAN systems for remote operation

  5. ESPEC (Cambridge, UCL) Contact: David Miller Design Considerations: • limit SR emittance growth • 360mrad total bend  0.5% • available space in lattice • no modifications necessary, yet • 10m drift space maximum one can consider for mechanical stabilization, alignment • 37m total empty space allows for BPMs outside of chicane to constrain external trajectories • Tiny energy loss before IP  Constraints lead to a required BPM resolution of ~100nm (Resolution  Stability) Measurement of Luminosity Energy Spectrum: Absolute E (survey, alignment) E jitter (fast BPMs) E dispersion (laserwire?)

  6. Laser amplification cavity for ILC polarimeter HEPOL: Contact: Fabian Zomer • Orsay 500 MHz or 5 MHz 10 nJ/pulse Electron beam 100 fs Pulsed laser Fabry-Perot cavity with Super mirrors Energy gain 104 • Proposed R&D : • Resonance of a high gain Fabry-Perot Cavity with a fs laser • Realization of a specific confocalcavity

  7. CAVBPM: Precision beam position monitor Contact: Marek Gasior Develop a BPM with <100 nm resolution, <10 µm precision, <15ns rise-time, with an aperture >4 mm for beam position monitoring in LC main beam and beam delivery system with the performance required from beam dynamics studies. • CERN TPMON: Precision beam phase measurement Contact: Jonathan Sladen • Precise phase stability of the main beam with respect to the RF is required for all linear colliders. • CLIC requires the phase error to be less than 15fs rms in order to limit luminosity loss. • This precision is more than an order of magnitude better than has currently been achieved both for phase reference distribution and for beam/RF phase measurement. • Both strategy and technology need to be found.

  8. CERN WBCM: Button PU Contact: Lars Soby Wide band beam current pick-up Develop a beam current monitor with  20 GHz bandwidth for measurement of intensity and longitudinal position bunch to bunch Provide a signal for machine set-up and for equalizing bunch-charge and -spacing. consist of 4 D=1.6mm buttons, from which the beam position and approximate intensity is derived. Can be used either as a standard PU or as a relative phase measurement along the pulse Applicable to LC main beams, drive beams and damping rings.

  9. CERN WBCM: ElectrostaticPU Contact: Lars Soby 100µs time constant → PU capacitance of order 100pF. dielectric constant >> 1 thickness of order 1mm. 4 electrodes: The special form of the cuts enhances linearity. electrode length ~ 50mm (2nF/m) output voltage ~ 4V Used to measure the overall pulse position

  10. DESY FLUM Contact: Wolfgang Lohman Studies of fastbeamstrahlung monitorfor IP beam characterisation V. Drugakov, ECFA workshop

  11. WP5 DIAG Summary • DIAG work package has maintained its scope, despite major cuts (travel and consumables were hit hard) • Increased input from the institutes was essential for this • Wide range of diagnostics – interesting programme • Many challenging issues addressed • Many institutes involved • Lots of interplay with the other WPs An interesting and challenging 3 years ahead of us