AgendaNovember 29, 2006 Meet-Me-Number: 1-877-991-5876 Passcode: 698067# MISSION INTEGRATION WORKING GROUP (MIWG) #7 • THEMIS Project Status P. Harvey/UCB • Payload Schedule Update (Astrotech and Launch Site Schedules) • Delta Program Status L. Loucks/Boeing • LV Hardware Status • Program Issues • Mission Integration Status L. Loucks/Boeing • Integration Schedule • Requirements Verification Matrix D. Tran/Boeing • SCN Review • Release of ICD Rev A • Action Item Review • Launch Site Integration Status • Side by Side Testing/Ladder Mods/SSS Installation V. Segall/Boeing • Fueling & Procedure Status C. Davis/NASA • Range Status on Required Deliverables & Procedures J. Wethern/45SW
AgendaNovember 29, 2006 Meet-Me-Number: 1-877-991-5876 Passcode: 698067# MISSION INTEGRATION WORKING GROUP (MIWG) #7 - Continued • Analysis Results L. Loucks/Boeing DTO Update • Thermal • RF Link Analysis • Controls/ACS Gas Budget Update • Mobile Telemetry Coverage L. Loucks/Boeing • Launch Management Update KSC • Mission Success Overview KSC • Review Spacecraft Mandatory / Required Launch Criteria KSC
AgendaNovember 29, 2006Meet-Me-Number: 1-877-991-5876 Passcode: 698067# GROUND OPERATIONS WORKING GROUP (GOWG) #5/ Delta GOR • Astrotech Readiness/Issues G. Gleeson/ASO FL • THEMIS Badging & Training Plan K. Kerr/Analex KSC • Launch Site Safety Status/Readiness C. Loftin/NASA Safety • Telemetry and Communications Status/Readiness M. Lougheed/NASA KSC • Spacecraft Procedure Status/Review R. Sterling/UCB • Launch Site Readiness Poll (Go/No Go) • THEMIS Project P. Harvey • NASA KSC Public Affairs G. Diller • Boeing Delta Mission Integration V. Segall • Astrotech Mission Management G. Gleeson • NASA LS Telemetry & Communicaitons M. Lougheed • NASA KSC Safety C. Loftin • NASA MM G. Skrobot • NASA LS Launch Site Integration W. Van Dyke • NASA LS Launch Site Integration Branch F. Stone
THEMIS PAYLOAD STATUS Peter R. Harvey Project Manager University of California - Berkeley
Payload Status • PCA Assembly and Test
Payload Status Acoustics & Shock Vibration Spin Balance Thermal Vacuum FM2/FM3 Thermal Vacuum Storage
ASO/PAD Schedule 2 Note: RCS MEOP & Leak are performed after hours
ASO/PAD Manpower Manpower • 27 Max while at ASO • 31 Max while at PAD
Summary Summary Status • Probes and Probe Carrier are Flight Ready • Plans and Procedures for ASO/PAD in Good Shape • Shipment Contracted Two Trucks w/ Lead Car Ready Issues Potentially Impeding Launch Processing • None
Side by Side Testing / Ladder Mods / SSS Installations V. Segall / Boeing KSC
Cape Status • Access Ladder • Ladder modified, proof loaded, available for use • Side-by-Side Testing • Procedure written and reviewed; ready for use • Date (15 Dec) coordinated • Logistics of delivery (14 Dec) discussed • Fork lift identified and available • Mission Integration will facilitate access for non-badged people • Actual delivery schedule discussion planned for post Astrotech THEMIS delivery
Cape Status • SSS Installation • Installation will be at Astrotech • Task is a payload support function; not a liability issue • Procedure (DCI) is written and in the review process • Date is under review: THEMIS requests the week of 18 Dec, but Boeing may not be ready until after the 3rd of Jan. See schedule • Later date needs real time coordination in parallel with THEMIS fueling activities in the HPF • The SSS installation is planned for a separate bay so that mechanical operations will be de-conflicted
KSC Fueling Team Status for THEMIS Presented to: THEMIS Pre-Ship GOR By: Chuck Davis Fueling Team Lead, TA-E3 November 29, 2006 KSC
KSC Fueling Team Status • Procedures: • THEMIS-specific deviations to OMI’s E5534 & E5502 are complete & under final review prior to obtaining signatures • OMI E5535 off-load procedure & pre-planned THEMIS-specific deviations will be available if required • ICD “Appx. C” is complete • MSPSP - Fueling GSE portion is complete • All GSE will be in-calibration at the time of use • Schedule: • Mobilize to Astrotech and set up GSE week of Dec 11 • Connect to spacecraft ~ Jan 3 • Prop load Jan 4 • Prop Loading Team is GO for THEMIS shipment
Range Status on Required Deliverables & Procedures J. Wethern/45SW
Range & Deliverables Status • MSPSP RELEASED & APPROVED • All required deliverables are up to date • PC handling procedure & Side by Side test are in review • All hazardous procedures in the NPF require Range Safety approval
Astrotech Readiness / Issues Gerard Gleeson / ASO FL
Mission Specific Items • Item 1005 Phone installation in Control Room – to be performed after arrival, units available • Item 1030 Training and Badging - to be performed after arrival • Item 1101 SCAPE Suits – to be delivered as required prior to loading operations • Item 1180 Training for Cranes and Forklifts - to be performed after arrival • Item 4000 LAN configuration – to be completed on arrival – infrastructure is ready • Item 4110 IONet configuration – to be completed on arrival – infrastructure is ready • Item4500 Voice Stations - to be installed after arrival, units available • Documentation • UCB Procedures received and reviewed, Comments sent to UCB • No major issues associated with Themis processing at Astrotech • Deliverables • All deliverables on site and ready for use, certificates presented in Data package as required Astrotech is ready to receive THEMIS
THEMIS Badging & Training Kathy Kerr / Analex KSC
KSC Badging & Training Status • SLC-17 Badging & Training • 41 THEMIS personnel identified for unescorted access to SLC-17 • 36 have good NAC/PRP; 5 are In Process • 5 THEMIS personnel identified for SCAPE operations. • 4 have completed SCAPE training; 1 person remaining • Open items: • Required training: ELSA, CCAFS Safety and SLC-17 walk downs to be scheduled post spacecraft arrival. • Schedule SCAPE training for one remaining person • AF Form 2856s have been completed and submitted to me. They will be submitted to Pass & ID about 1 month prior to required pad access. • Air Force Badging once prerequisites have been completed. • Launch Site Planning Readiness Statement: • Plans are in place to complete remaining open items. • KSC Badging & Training is ready for THEMIS flight hardware arrival.
NASA / KSC Safety Readiness for THEMIS Chuck Loftin System Safety Engineer KSC Safety & Mission Assurance Launch Services Division 29 November 2006
Safety Documentation Status • MSPSP - Final MSPSP approved 2 Nov 06 • S/C Processing - Ground Processing Approval letter provided prior to THEMIS Delta GOR • Procedures - Integrated and Contingency Procedures under review
Readiness Statement • NASA/KSC Safety and Mission Assurance, Launch Services Division has assessed the readiness of the THEMIS spacecraft for NASA at Astrotech, and has no constraints to the arrival of the Spacecraft. - Any open items or issues are being tracked via the Verification Tracking Log (VTL).
Telemetry and Communications Status / Readiness Marty Lougheed / NASA KSC
TELEMETRY & COMMUNICATIONS READINESS • NASA Communications has had no change in our position since the THEMIS GOR …………… • we are "GO" for the THEMIS 11 Dec arrival.
Status of Launch Site Procedures Rick Sterling Themis I & T Manager
Launch Site Procedures Following charts show status, where used and whether hazardous.
Launch Site Procedures To download procedures or see more detailed listing including author, revision number, etc: ftp://apollo.ssl.berkeley.edu/pub/THEMIS/2 Space Segment/2.2 Spacecraft/2.2.7 Launch Site Processing/2.2.7.1 Launch Vehicle Integration
Launch Site Readiness Poll William Van Dyke / NASA KSC
Launch Site Readiness Poll (Go/No Go) • THEMIS Project Peter Harvey • NASA KSC Public Affairs George Diller • Boeing Delta Mission Integration Vic Segall • Astrotech Mission Management Gerard Gleeson • NASA LS Telemetry & Communicaitons Marty Lougheed • NASA KSC Safety Chuck Loftin • NASA MM Garrett Skrobot • NASA LS Launch Site Integration William Van Dyke • NASA LS Launch Site Integration Branch Frank Stone