An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PWO/APD/CSP Developmentat Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN

  2. - Presentation Outline - • Recent Activities on PWO/APD/CSP at Hiroshima University • readout electronics status update • CSP design version 3 • continuing property studies of key components • better expertise on PWO/APD handling • calorimeter prototype performance evaluation • beam tests at KEK-PS and Hiroshima-REFER • Summary and Outlook • Official Business PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  3. - Pre-amplifier Design Revised (Ver.3) - • slightly modified layout (see next slide) • no circuit change from version 2 • proposed and discussed in July, 2004 • version 3 status and plan • 100 boards in production • delivery expected in late-September, 2004 • 50 of them w/o capacitor “C5” mounted • to decouple test input pin from signal lines • to be sent to Iouri at CERN for evaluation • shipping planned in October, 2004 PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  4. - New Pre-amplifier Layout (Ver.3) - • version 3 mask (black) overlaid on version 2 photo (green) • components moved (from yellow to red) to make space around APD soldering holes PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  5. - Pre-amplifier Task and Schedule - • early decision of CSP version required • version 2 or 3 on 1st PHOS module ? • need to complete mass production in JFY04 (ending March, 2005) • CSP for 1st PHOS module coming soon • to be ready for assembly by late-January, 2005 PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  6. - Past PWO Crystal Property Studies - • Furukawa Co. Ltd. in Tokyo, Japan density 8.28 [g/cm3] radiation length 0.89 [cm] Moliere radius 2.2 [cm] peak emission 420-440 [ns] refractive index 2.3 Y-doped PbWO4 transmittance measured with Hitachi U3010 spectrophotometer 20 x 20 x 200 mm ALICE-PHOS operation point ALICE-PHOS operation point light yield mean decay time PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  7. - Recent PWO Crystal Property Studies - • RI&NC Co. in Minsk, Belarus • adopted by CMS • investigated; similar properties as Furukawa’s • ref. graduation thesis by K.Yokoyama (available only in Japanese) • North Crystal Co. in Apatity, Russia • adopted by ALICE-PHOS • detailed investigation ongoing at Hiroshima • further comparison of crystals in progress PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  8. - Expertise on PWO/APD Handling - • cooling with Peltier modules • stable operation down to ~ 0 ºC • better ground handling to reduce noise • successful operation of APD readout system PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  9. - Prototype Performance Evaluation - • prototype components • PWO crystals: Furukawa (Japan) / RI&NC (Belarus) / North Crystal (Russia) • PMT: Hamamatsu R1450 • APD: Hamamatsu S8664 • pre-amplifier: Hiroshima ver.1/2 • cooling: Peltier modules • tests in Japan • Tohoku-LNS (2002); photons at 0.8 – 1.2 GeV • Hiroshima-REFER (2003/04); electrons at 150 MeV • KEK-PS (2004); electrons at 0.5 – 2 GeV PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  10. - Past Beam Tests at LNS/REFER - • w/ PMT readout • sE/E = 2.5 %/E [GeV]  1.3 % • sx = 2.3 mm/E [GeV] • noise problem with APD at room temp. counts [a.u.] Etotal = 141 MeV σ/Etotal= 7.3 % = 2.8 % /E total energy [MeV] PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  11. - Recent Beam Test at KEK-PS - • prototype w/ real ALICE-PHOS components • NC PWO + Hamamatsu APD • electron enriched non-separated (IT) beam • negatively charged • electron/beam ~ 1 % before online enrichment • beam momentum scan • 0.5 GeV/c – 2.0 GeV/c • APD HV scan • 380 – 430 V (400 V nominal) PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  12. - KEK-PS T564 (16-23 June, 2004) - • 31.3 M total (mixed) triggers; including 664 K electron triggers • successful operation of APD readout PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  13. - PWO/APD/CSP/Readout Signals - ADC distributions pre-amplifieroutput punch-through hadrons electrons shaping amplifier output PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  14. - Hiroshima’s Prototype Performance - • sE/E = 5.5 % at 1 GeV/c, 3.1 % at 2 GeV/c • with quick and rough near-line calibrations • including significant beam momentum spread • analysis ongoing to subtract external contributions electrons in center cell selected gas cherenkov hit required PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  15. - cf.Kurchatov’s Prototype Performance - • Kurchatov 1616 prototype • sE/E at –25 ºC : 1.3 %/E [GeV]  3.6 %/E [GeV]  1.1 % PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  16. - Summary and Outlook - • charge-sensitive preamplifier (CSP) design revised; version 3 in test production • CSP for 1st PHOS module by January, 2005 • continuing basic property investigation of PHOS key components (PWO/APD/readout) • several prototypes fabricated/tested • better local expertise • independent PHOS prototype performance evaluation in progress PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  17. - Official Business - • applied for ALICE associate collaboration • together with Tokyo and Tsukuba Universities • approval requested at next ALICE meeting • “official” PHOS participation expected soon PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.

  18. - PHOS Collaboration at Hiroshima U. - • 3 staffs, ~10 graduate students • H.Harada, K.Haruna, K.Hirashita, K.Homma, K.Hosokawa, R.Kohara, Y.Nakamiya, M.Ouchida, H.Sakata, K.Shigaki, T.Sugitate, D.Toyoda, Y.Tsuchimoto, K.Yokoyama • Hiroshima PHOS web page • http://www.hepl.hiroshima-u.ac.jp/quark/pwo/ PWO/APD/CSP Development at Hiroshima U. - T.Sugitate, K.Shigaki, et al.