An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam test of GEM-TPC, HBD and PWO CNS-Tokyo : H.Hamagaki, K.Ozawa, M.Inuzuka, T.Sakaguchi, S.Kametani, F.Kajihara,T.Gunji, T.Isobe,N.Kurihara, S.Oda, Y.Morino, S.Saito Waseda : Y.Yamaguchi KEK : S.Sawada RIKEN : S.Yokkaichi Hiroshima : T.Sugitate, K.Shigaki, K.Homma, R.Kohara, D.Toyoda, H.Harada, K.Haruna Weizmann : I.Tserruya, I.Ravinovich, A.Kozlov BNL : A.Milov

  2. Schedule • KEK PS (12GeV) p2 test beam line • Time table • Preparation : 2004/05/10 – 2004/05/17 • Beam time : 2004/05/18 – 2004/05/24 • Withdrawal : 2004/05/25

  3. Detector layout • Scintillator – Trigger & TOF (CNS) • Gas Cherenkov – Electron ID (KEK) • SSD – Tracking (CNS), (DC (KEK)) • GEM-TPC (CNS) • HBD (CNS, Weizmann) • PWO (Hiroshima), (PbGl (CNS))

  4. Gas : P10 and CF4 Topics of Measurement Efficiency Position resolution Particle ID by dE/dx Two track separation power Dependence Gas Pad shape Drift distance Voltage of GEM Incident angle To do list Preamp Readout Pad Gas GEM DAQ GEM-TPC 50 patterns

  5. VME Module • FADC : RPV160(8ch) x3 • ADC : V792(32ch) x1 • TDC : V775(32ch) x1+a (for DC) • V551 : for SSD • Trigger : GSI Trigger Module x1 • 8ch x 3FADCs (GEM-TPC) • 5ch ADC & TDC (Scintillator) • 2ch ADC & TDC (Gas Cherenkov) • 1ch ADC & TDC (Lead Glass) • 9ch ADC & TDC (HBD CNS) • 9ch ADC & TDC (HBD Weizmann) • V551 (SSD) • 64ch TDC (DC) • ?????? (PWO)

  6. NIM Module

  7. Cable • SHV 25m x 18 • SHV 20m x 10 • LEMO (narrow) 25m x 25 • LEMO (thick) 40m x 30 • Flat 25m x 8 (TPC) • Short LEMO cables are needed for circuit. • 20cm, 40cm, 80cm, …

  8. S1, S3, Gas Crk (6PMTs) ~-2700V S2, PbGl (2PMTs) ~-1500V TPC Field ~-20kV TPC GEM ~-4kV HBD mesh & GEM x2 ~-3kV SSD DC -30kV (1ch) -5kV (2ch) -5kV (1ch) -3.6kV (4ch) Zenner divider HV

  9. We have 3 1ch-LVs. LV • TPC +/- 5V • HBD-CNS • HBD-WIS • SSD

  10. Gas • CF4 (TPC 3kL, HBD-CNS 2kL, HBD-WIS 2kL) • Ar(90%)+CH4(10%) (TPC 3kL, HBD-CNS 2kL) • N2 (7kL) • Ar+C2H6 (DC ??) • CO2 (Gas Crk ??) • Other gas? (HBD-CNS) • Mass flow meter, regulator, pipe, …

  11. Table & support