1 / 1

Page 1 of 1

Engineering & Construction Management Department. August 2011. Montoya Heights Drainage Improvement P3.

shelley
Download Presentation

Page 1 of 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering & Construction Management Department August 2011 Montoya Heights Drainage Improvement P3 General Project Description: The project includes installation of berm and approximately 800 lf of box culvert to convey storm water coming from the Helen of Troy –IH10 box culvert crossing to Coates Dam PROJECT SCHEDULE Design Status: Preliminary Design under review. Pending Issues: Acquiring drainage easements. Overall Project Budget (includes approved project development, design and construction costs): $ 1, 500, 000.00 Funding Source(s): 2004 Bond Project Contact Project Manager: Geoffrey Espineli 541-4200 Design Consultant: Quantum Engineering Page 1 of 1

More Related