1 / 1

Page 1 of 1

Engineering & Construction Management Department. August Report , 2011. EPIA Hangar #7 – Reconstruction and Renovation.

dasha
Download Presentation

Page 1 of 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering & Construction Management Department August Report, 2011 EPIA Hangar #7 – Reconstruction and Renovation General Project Description: Renovate the existing hangar including 22,271 SF of office space, 32,331 SF of hangar space and 1,613 SF of storage area as well as required site improvements. PROJECT SCHEDULE Design Status: The preliminary design is due September 26, 2011. Pending Issues: None at this time Overall Project Budget (includes approved project development, design and construction costs): $5,500,000.00 Funding Source(s): Airport Enterprise Fund Project Contact Project Manager: Victoria Ruiz 541-4357 Design Consultant: Moore, Nordell, Kroeger Architects Page 1 of 1

More Related