1 / 17

beam intercepting devices for LINAC 4

beam intercepting devices for LINAC 4. Status Report, ENTM 02/11/2010. Overview. Beam stoppers for source/LEBT and for Linac4 transfer line Chopper line collimator Beam dumps for the movable bench (C. Maglioni) 50-100 MeV measurements bench dump Beam dumps for LBE/LBS lines and LBS slit

shiloh
Download Presentation

beam intercepting devices for LINAC 4

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. beam intercepting devices for LINAC 4 Status Report, ENTM 02/11/2010

  2. Overview • Beam stoppers for source/LEBT and forLinac4 transfer line • Chopper line collimator • Beam dumps for the movable bench (C. Maglioni) • 50-100 MeV measurements bench dump • Beam dumps for LBE/LBS lines and LBS slit • Head, tail, H0/H- internal dumps for the PSB injection region (R. Chamizo) • Linac4 main dump (R. Chamizo) O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  3. LINAC 4 layout O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  4. LINAC 4 layout • Beam stoppers for source/LEBT • 50-100 MeV measurements bench dump • Beam dumps for the movable bench (C. Maglioni) • Linac4 main dump (R. Chamizo) • Chopper line collimator O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  5. Beam stoppers for source/LEBT • Beam parameters LINAC4 Project Document No. L4-T-ES-0001 EDMS Document No. 1057463 Racetrackflanges are housing the beamstopper. Twoflangesfacingeachother (180°) O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  6. Beam stoppers for source/LEBT • Design finished • Production started • Ready by the end of the year • One unit withIris to produce a pencil beam O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  7. Chopper line collimator (3MeV) • Produced and installed O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  8. Beam stopper forLinac4 transfer line • Slit LBS • Slits LBE • Fast beam stopper • Sieve (removed) • Beam stopper O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  9. Beam stopper forLinac4 transfer line • Intension to reuse the existing stopper tank (layout dimensions and functionality) • Simulations for the material to be done • Cooling to be foreseen (additional piping) O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  10. Beam dumps for LBE/LBS lines and LBS slit LINAC4 Project Document No. L4-B-ES-0001 v.1.0 EDMS Document No. 1056611  v.1.0 • SPECIFICATIONS FOR BEAM DUMPS IN LINAC4 DUMP LINE, LBE AND LBS LINES • F. Regis will work on that • LBE dump • LBS dump, feasibility study for integration done • LBS slit • Start with the 3-12 MeV slit design • Go towards a stripping foil with a dedicated dump (below the spectro-meter magnet? • Have a thick slit,absorb most, but less clean beam? O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  11. 50-100 MeV measurements bench dump LINAC4 Project Document No. L4-T-EP-0004 v.0.2 EDMS Document No. 1094599 v.0.2 • USER SPECIFICATIONS FOR LINAC4 COMMISSIONING DUMP AT 50 AND 100 MEV • To be treated together with the main dump (160MeV) • Two solutions: • A “movable“ version for 50 and 100 MeV • Use a stationary dump for 160 MeV O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  12. 50-100 MeV measurements bench dump 100 MeV 50 MeV O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  13. Planning • Chopper collimator done • Source stopper ready in January 2011 • Dumps for the measurement bench April 2011 • 50/100 MeV dump – 160 MeV main dump for the end of 2012 • LBE/LBS and slit from 2013 onwards • TL beam stopper for 2014 • Head and tail /H0/H- for 2014 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  14. EVM / Planning O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  15. EVM / Planning • EVM to be created for: • 3-12 MeV measurement bench • LBE/LBS dumps and LBS slit • And the 50/100 MeV dump DRAFT O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  16. Reserve slides O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

  17. Reserve O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20