Ops. AGENDA

14.00 - 14.50 Operations status and Matters arising L. Metcalfe G. Buenadicha 14.50 - 15.20 EPIC instrument health/monitoring M. Smith 15.20 - 15.45 Future instrument operations at ESA L. Metcalfe 15.45 - 17.30 DISCUSSION with Coffee: Operations

shlomo
Download Presentation

Ops. AGENDA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 14.00 - 14.50 Operations status and Matters arising L. Metcalfe G. Buenadicha 14.50 - 15.20 EPIC instrument health/monitoring M. Smith 15.20 - 15.45 Future instrument operations at ESA L. Metcalfe 15.45 - 17.30 DISCUSSION with Coffee: Operations interface between ESA and the PI teams Ops. AGENDA

  2. Meeting/action Status Subject Actionee Due EPIC TTD-0014/3 Open Explain increases in pn offset variance in the 840 M. Smith 2005-03-03 to 870 plus revolution range EPIC TTD-0014/9 Open Make MOS2 CCD5 effect public M.Stuhlinger 2005-03-03 EPIC TTD-0015/3 Open Subsequently to evaluate and decide which of the A.Abbey 2005-11-03 items resulting from action 15/2 can be delivered EPIC TTD-0016/1 Open Investigate the possibility of MOS Small Window A. Abbey, 2006-05-29 mode in peripheral CCDs M.Casale ACTIONS

  3. SCIENCE OPERATIONS STATUS for EPIC TTD MEETING PALERMO 11-13 April 2007 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager

  4. Significant meetings and dates Operations: Status & Modes General Calibration Points Data Processing - SSC Miscellaneous CONTENTS

  5. SIGNIFICANT MEETINGS & DATES

  6. OM Cal.& TTD meeting @ MSSL Next 17 Apr. 2007 Intnl. Working Group on cross-calibration and the 08-11 May 2007 definition of X-ray standards no.II. (IACHEC) MEOR Review Team presentations at ESTEC 09-10 May 2007 MEOR Review Board meets at ESTEC 22 May 2007 Users Group meeting #8 (UG#8) Dry Run#1 Thursday 24 May 2007 UG#8 Dry Run#2 Thursday 31 May 2007 ESAC Science Workshop 2007 (3 days from...) 04-06 June 2007 XMM-Newton Users Group meeting #8 07-08 June 2007 SAS Workshop 2007 19-22 June 2007 "X-rays from nearby galaxies" @ ESAC (Faculty) 05-07 Sep. 2007 EPIC Consortium Meeting @ Leicester 11-13 Sep. 2007 EPIC Cal./Ops. Meeting @ Mallorca 29-30 Oct. 2007 Calibration: Background Working Group (BGWG) 31 Oct. 2007 ESAC Faculty Wk. Shop on Hot Stars ~Oct. 2007 SIGNIFICANT MEETINGS

  7. Proceedings of 2006 Conference (“Variable and Broad Iron Lines around Black Holes”) distributed as Astronomische Nachrichten/Astronomical News Volume 327, Issue 10, Pages 941-1100 (December 2006) SAS SAS 7.1 to be released mid-July (linked to reprocessing and 2XMM) SIGNIFICANT DATES I

  8. AO6 Call Closeed XRPS 09 Feb. 2007 Begin AO6 observations May 2007 AO7 Call Announcement of Opportunity 28 Aug. 2007 Due date for proposals 12:00UT 05 Oct. 2007 Final OTAC approved programme late Dec. 2007 For approved proposals only:==> Start of phase II proposal submission 14 Jan. 2008 Closure of phase II proposal submission 09 Feb. 2008 Start of AO-7 observations May 2008 SIGNIFICANT DATES II Page 8

  9. OPERATIONS

  10. All instruments essentially stable Slow Slew Mode implementation for general users in analysis Slewing / re-pointing ‘mode’ for RGS implementation for general users in analysis. STATUS and MODES

  11. GENERAL CALIBRATION POINTS

  12. XMM-CCF-REL-222 Update of EPIC MOS2 gain epoch revs. 446-533 31-Oct-2006 XMM-CCF-REL-221 Update of EPIC MOS2 CTI epoch revs. 446-533 31-Oct-2006 XMM-CCF-REL-201 EPIC pn Frame Times and Clock Sequences 02-Nov-2006 XMM-CCF-REL-224 New MOS CTI CCFs public 15-Mar-2007 XMM-CCF-REL-225 Update of EPIC MOS Gain 15-Mar-2007 XMM-CCF-REL-226 RGS Bad Pixels 22-Mar-2007 XMM-CCF-REL-205 PN telescope effective area modification at high E 07-Apr-2007 CCF RELEASE NOTES IN PERIOD

  13. NRCOs Investigation of EPIC soft flux discrepancies MK 2006-11-14 Approved OM photometric calibration AT 2006-12-04 66 RGS-Procyon: The RGS wavelength scale APo 2007-01-11 and line-spread function 67 MOS redistribution off axis and QE check MK 2007-01-18 68 MOS redistribution off-axis and QE check-2 MK 2007-01-31 69 Calibration of pn temperature effects MK 2007-02-08 EORs 01 MOS 3x3 mode QE and pattern Uncom. MK 2007-02-28 02 Cal. Of RGS single-node readout Uncom. APo 2007-02-28 NRCOs & EORs

  14. DATA PROCESSING - SSC

  15. Turn-around time between data acquisition and GO (PIPE) delivery as of 31-December-2006

  16. MISCELLANEOUS PUBLICATIONS OTHER …

  17. Dec. 31 2006  1341