GOES Program

GOES Program. Steven P. Kirkner GOES Program Manager, NOAA/NESDIS. December 12, 2002. OUTLINE. Program Status Launch Planning GOES-R Series. GOES On-Orbit Status. GOES-8 continues to function as the GOES-East operational satellite Functioning on several redundant systems

shyla
Download Presentation

GOES Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GOES Program Steven P. Kirkner GOES Program Manager, NOAA/NESDIS December 12, 2002

  2. OUTLINE • Program Status • Launch Planning • GOES-R Series

  3. GOES On-Orbit Status • GOES-8 continues to function as the GOES-East operational satellite • Functioning on several redundant systems • Depletes all fuel reserves by April 2003 • Has exceeded operational life by 3 + years • GOES-9 removed from operational service in July 1998 • Being made available to the Japanese to provide emergency coverage, if necessary • GOES-10 has functioned as the GOES-West operational satellite for the last 4 years • Difficult to quantify amount of mission life lost due to Solar Array anomaly • GOES -11 and GOES –12 are in on-orbit storage mode, ready to replace either GOES-East or West • Transition plan being developed to move GOES-12 to GOES-East

  4. GOES-N Series Development/Production Status • GOES-N Series Spacecraft (Boeing Satellite Systems (BSS), Inc.) • Government provided instruments delivered to Spacecraft contractor and successfully integrated on GOES-N Spacecraft • GOES-N Spacecraft system level testing underway • GOES-N Series Spacecraft Support Ground System (SSGS) delivered to NOAA’s SOCC • Successfully completed two command/TLM/Data End-to-End testing between Spacecraft and NOAA’s SOCC • GOES-N Spacecraft on schedule to support January 2004 launch readiness • The GOES-O Bus and Payload Modules Completed

  5. GOES-N - Anechoic Chamber

  6. GOES-N Series Instruments Status • GOES-N Series Imagers and Sounders (ITT) • The GOES-N (S/N08) Imager and Sounder mechanically/electrically integrated onto the GOES-N bus • The GOES-O (S/N09) Imager and Sounder mechanically integrated on to the GOES-O bus • GOES-P (S/N10) Imager and Sounder are in temporary storage at ITT. • Preliminary integration of S/N 11 Imager and Sounder started, leading to the ship dates of June 14, 2003 for the Imager and July 31, 2003 for the Sounder.

  7. GOES-N Spacecraft Instrument Testing • Spacecraft in the Z over west panel down configuration • Sounder radiant cooler door open in preparation for ITT to perform the door hinge friction test • Picture taken 3/26/02

  8. GOES-N Series Instruments Status(Continued) • NOAA GOES-N Series FM1 and FM2 Solar X-Ray Imagers (SXI) • The FM1 SXI delivered to BSS November 2001 • Successfully integrated on GOES-N • The FM2 SXI delivered to BSS September 2002 • Successfully integrated on GOES-O for ground testing, but may not fly on GOES-O • GOES-N Series Space Environment Monitor (SEM) • GOES-N SEM - Successfully delivered and integrated on GOES-N • Delivery of the GOES-O SEM - December 2002 (Lockheed Martin)

  9. GOES Launch Planning

  10. GOES-R Series • GOES-R series will be designed to satisfy User’s needs in the 2012 to 2025 time frame • Advanced Baseline Imager (ABI) • Advanced Imaging • Hyperspectral Environmental Suite (HES) • Advanced Sounding and Imaging • SXI • Solar imaging • SEM • Space environment monitoring • Other Advanced Instruments • GOES Auxiliary Services • DCS, LRIT, EMWIN, SARSAT