50 likes | 176 Views
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe. MXS control june 17, 2010. PERT chart changes. Added section for MXS testing; asked Keith to send MXS by end of next week See chart at http://nasa.ece.olin.edu/projects/2010/mxs/files/PERT_chart.xlsx. PIC code.
E N D
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe MXS controljune 17, 2010
PERT chart changes • Added section for MXS testing; asked Keith to send MXS by end of next week • See chart at http://nasa.ece.olin.edu/projects/2010/mxs/files/PERT_chart.xlsx
PIC code • Got Brad’s USB DAQ to work • Measures input voltages, outputs desired voltages • We would only need to adjust which pins we use (whether we want an external ADC and more outputs) • ID what we do not need from the code
GUI code • Completed: • Constraining user inputs to specified limits • Determining how to implement ASCII file loading • In progress: • Testing ASCII file loading • Continuous updating • PIC interface
Next steps • Continue finalizing GUI and PIC code • Work on interfacing GUI and PIC