Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe. MXS control july 13, 2010. Progress. Tested system with higher-current op-amps; able to change x-ray output by setting LED voltage Outlined sections for write-up; started working on some sections. Next steps.
E N D
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe MXS controljuly 13, 2010
Progress • Tested system with higher-current op-amps; able to change x-ray output by setting LED voltage • Outlined sections for write-up; started working on some sections
Next steps • Continue with GUI work • Improvements: • Frequency controls • Voltage limiting on LED • Larger ADC for better voltage measurements • Storing LED output on PIC • Other: • Box design • Write up report/user’s manual