1 / 9

Mallard Island Large Rivers Loading: Monitoring WY 2010

Item #4. Mallard Island Large Rivers Loading: Monitoring WY 2010. Nicole David Sources, Pathway, and Loading Work Group May 27, 2009. Item #4. Background. SPLWG recognized Delta outflow as potentially significant pathway for contaminants Identified as a high priority information gap

sitara
Download Presentation

Mallard Island Large Rivers Loading: Monitoring WY 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Item #4 Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009

  2. Item #4 Background • SPLWG recognized Delta outflow as potentially significant pathway for contaminants • Identified as a high priority information gap • Study initiated in 2002

  3. Samples Collected Item #4 *Contingency money used (15 samples)

  4. Delta Outflow from 12/20/05 to 01/25/06 Item #4 370,000 cfs

  5. Item #4 Load Estimates

  6. Item #4 Slope 0.29 - Tidal SSC – Hg Relationships Influence Loads Slope 0.11 - Low Flow High Flow - Slope 0.22

  7. Item #4 PCB Loads and Allocations

  8. Item #4 Hg Loads and Allocations

  9. Item #4 Sampling Budget Example 5–6 Storms 40 samples for Hg, PCBs, and sediment $35,000 20 samples for Hg speciation (HgD, MeHgT, MeHgD, Hg(II)) $10,000 Lab Total $45,000 Field Labor $25,000 Project Management + Reporting $30,000 Overall $100,000

More Related