Engineering & Construction Management Department. June Report 2011. Sandstone Ranch Park.

sorcha
Download Presentation

Construction Activities:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering & Construction Management Department June Report 2011 Sandstone Ranch Park • General Project Description: Park design to include parking area, pathway, rock wall for playground area, wood fiber surface, picnic shelter, bike rack, park signs, landscaping, irrigation, and lighting. Park Pond Construction Activities: • Contractor has completed the concrete flume surrounding the perimeter of the park Photo Project Schedule Page 1 of 2

  2. Engineering & Construction Management Department JuneReport, 2011 Project • General Project Description: Park design to include parking area, pathway, rock wall for playground area, wood fiber surface, picnic shelter, bike rack, park signs, landscaping, irrigation, and lighting. Project Budget: $537,008.64 Notes Funding Source: Texas Parks & Wildlife Grant and Parkland Dedication Funds Project Contact Project Manager Yvette Hernandez 915-541-4200 Design Consultant AIA Engineers, Ltd. Construction Contractor Three C’s Contractors, Inc. Page 2 of 2

More Related