1 / 9

Enhancing CTE Implementation: Local Application Tools

This guide outlines the requirements and elements for preparing effective local applications under Perkins funding. It covers programmatic, fiscal, and accountability content, emphasizing the importance of reflecting state and local CTE visions. The tools provided include budget tables, accounting categories, program categories, and budget matrices to ensure proper utilization of funding. Eligible recipients can also utilize the same tools to enhance CTE program implementation at the local level.

starg
Download Presentation

Enhancing CTE Implementation: Local Application Tools

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LOCAL APPLICATIONS UNDER PERKINS KEY ELEMENTS

  2. REQUIREMENTS • LOCAL APPLICATIONS MUST ADDRESS THE REQUIREMENTS OF SECTION 134 OF PERKINS • OPTIONS • A. THROUGH 5-YEAR LOCAL APPLICATIONS & ANNUAL UPDATES • B. THROUGH ANNUAL LOCAL APPLICATIONS

  3. LOCAL APPLICATION CONTENTS • A. PROGRAMMATIC • B. FISCAL • C. ACCOUNTABILITY

  4. PURPOSE OF LOCAL APPLICATIONS • A. NOT MERELY A MECHANISM TO INSTITUTE THE FLOW OF FEDERAL PERKINS FUNDS FROM THE STATE TO ELIGIBLE RECIPIENTS • B. SHOULD EMBODY THE STATE AND LOCAL VISIONS FOR CTE • C. UNIFICATION OF THE PROGRAMMATIC, THE FISCAL AND THE ACCOUNTABILITY ASPECTS

  5. LOCAL APPLICATION TOOLS --- 1 • A. USE FUNDING FLOORS AND CEILINGS • B. FUNDING FLOORS • 1. 6% OF ALLOCATION FOR GUIDANCE • 2. 10% FOR SPECIAL POPULATIONS • C. FUNDING CEILINGS • 1. NO MORE THAN 30% OF ALLOCATION FOR EQUIPMENT D. RESERVE

  6. LOCAL APPLICATION TOOLS --- 2 • A. SIZE, SCOPE, AND QUALITY • B. SIZE --- MUST HAVE X NUMBER OF STUDENTS • C. SCOPE --- MUST BE A PROGRAM OF STUDY; SEQUENCE OF COURSES; CAREER PATHWAY • D. QUALITY --- MET CORE INDICATORS

  7. LOCAL APPLICATION TOOLS --- 3 • A. BUDGET TABLE FORMAT • B. ACCOUNTING CATEGORIES • C. PROGRAM CATEGORIES • D. BUDGET MATRIX

  8. LOCAL APP. TOOLS AT LOCAL LEVEL • A. ELIGIBLE RECIPIENTS CAN USE MANY OF THE SAME TOOLS TO STRENGTHEN LOCAL IMPLEMENTATION OF CTE PROGRAMS • 1. SSQ • 2. FLOORS AND CEILINGS • 3. A BUDGET MATRIX • 4. RESERVE

More Related