1 / 10

Arena Needs Assessment City of Peterborough

Arena Needs Assessment City of Peterborough. Presentation to the Areans , Parks and Recreation Advisory Committee Robert Lockhart The RETHINK GROUP June 18, 2013. The Project Team. Robert Lockhart – The RETHINK GROUP Donna Lockhart – The RETHINK GROUP Bill Lett – Lett Architects Inc.

stash
Download Presentation

Arena Needs Assessment City of Peterborough

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Arena Needs Assessment City of Peterborough Presentation to the Areans, Parks and Recreation Advisory Committee Robert Lockhart The RETHINK GROUP June 18, 2013

  2. The Project Team Robert Lockhart – The RETHINK GROUP Donna Lockhart – The RETHINK GROUP Bill Lett – Lett Architects Inc.

  3. Project Objectives and Outcomes For City arenas: assess the characteristics/features, quality/condition, utilization, functional capabilities, financial efficiency, distribution relative to current and future population, level of provision, and relationship with area arenas. Demand assessment: research leisure trends; local and regional population growth and change predictions; user group registration and other use patterns; facility utilization and patterns; facility wait lists; the opinion of user groups, municipal staff, institutional customers and partners; and the use of area arenas by Peterborough groups.

  4. Project Objectives and Outcomes Determine the number of ice surfaces required to meet current ice and non-ice needs – and establish the preferred provision level. Looking ahead 20 years, project the number of ice surfaces required to meet future needs - use the recommended provision guideline to determine future facility requirements, based on projected population growth and change, as well as leisure trends. Determine and evaluate provision strategies, and select the preferred option (including recommended characteristics/features of new facilities, improvements to existing arenas, potential partners, possible facility configurations and location possibilities).

  5. Consultation Program City web site – project described, progress updated, on-line survey to solicit input www.peterborough.ca/arenaneedsassessment Ongoing call for submissions and briefs from groups and individuals User Group Survey - to collect information from all groups User Group Forum - to solicit initial input from main user groups and partners (June 19)

  6. Consultation Program Meetings with groups as required throughout the project Three meetings with the Arenas, Parks and Recreation Advisory Committee Two meetings with City Council (first set for July 29) Community-wide Forum - to report on and solicit input re: findings, conclusions and emerging recommendations/strategies/options – all current and potential user groups, other interested groups and individual residents to be invited

  7. Progress First meeting with project committee (May 10) Arena tour and collection of specifications, financial information, condition, planned upgrades/repairs, etc. Detailed research and analysis of the utilization of City arenas – initiated Community profile - initiated Population growth and change - initiated

  8. Progress On-line survey – designed and launched User Group survey – designed and launched Media information event (June 12) Preparations for the User Group Forum (June 19) Preparations for this APRAC meeting Trends research – leisure activities, arena facilities - ongoing

  9. Next Steps Meetings with the Pete’s, the Lakers, Trent University, Rocklands Entertainment (the Memorial Centre as a concert venue) Consultation with area municipalities re: their arenas (utilization, plans, potential impact of arena expansion in Peterborough, etc.) Examine all other demand indicators. Begin to analyze research results.

  10. Questions

More Related