Report from Superintendent Board of Education Meeting January 15, 2014
Reynolds Field Proposal 1400 Meter Track6 Lanes (2 inner lanes)Lower Reynolds stays the same
Reynolds 400 Meter Track 6 lanes (2 inner)
Reynolds Field Proposal 2400 Meter Track6 Lanes, relocate tennis courts
400 Meter 6 lane track at Reynolds – Relocate tennis courts
Costs – Reynolds Proposal 1 - $2.68 Million Proposal 2 - $2.4 Million (not including tennis court relocation $440K ) **Both proposals include sidewalk at Chauncey Optional Considerations • Walking Lights (6) $ 48,000 • Storage Building $120,000 (Cost considerations for every $100K added equals $1.63/year/average house) In-Kind replacement @ Reynolds $ -750,000 (Savings Approx. $12.23/year/average house)
Costs - Burke • Proposal 1 • Upper Burke expansion (3 level fields) = $1.06 Million • Lower Burke Tennis Courts =$ 440 K • Proposal 2 • Upper Burke Expansion (3 tiered fields) = $1.7 Million • Lower Burke Tennis Courts = $ 440 K Optional Considerations • Increase Baseball Right Field $ 60,000 • Bathrooms $ 143,000 • Landscaping $ 50,000 • Aerate, Topdress, Overseed lower field $ 36,000 • New Roadway, turnaround and handicapped parking $108,000 (Cost considerations for every $100K added equals $1.63/year/average house)
Cost Summary • Proposal 1 Reynolds 1 $2.68 Million Burke 1 $1.06 Million Total Fields $3.74 Million Total Buildings $4.05 Million Total $7.79 Million $- 500K (Reserve) Total Bond $7.29 Million Total Annual Cost – Average House $ 118.83
Cost Summary • Proposal 2 Reynolds 1 $2.68 Million Burke 2 $1.7 Million Total Fields $ 4.38 Million Total Buildings $ 4.05 Million Total $8.43 Million $- 500K (Reserve) Total Bond $7.93 Million Total Annual Cost – Average House $ 129.26
Cost Summary • Proposal 3 Reynolds 2 $2.4 Million Burke 1 $1.5 Million Total Fields $3.9 Million Total Buildings $4.05 Million Total $7.95 Million $- 500K (Reserve) Total Bond $7.45 Million Total Annual Cost – Average House $ 121.43
Cost Summary • Proposal 4 Reynolds 2 $2.4 Million Burke 2 $2.1 Million Total Fields $4.5 Million Total Buildings $4.05 Million Total $8.55 Million $- 500K (Reserve) Total Bond $8.05 Million Total Annual Cost – Average House $131.21
Cost Recap ProposalTotal Bond (using $500K from Capital Reserve) 1 (Reynolds 1; Burke 1) $7.29 Million 2 (Reynolds 1; Burke 2) $7.93 Million 3 (Reynolds 2; Burke 1) $7.45 Million 4 (Reynolds 2; Burke 2) $8.05 Million Options Reynolds Storage Building $120,000 Walking Lights $ 48,000 Burke Increase Baseball Right Field $ 60,000 Bathrooms $143,000 Additional Landscaping $ 50,000 Aerate, Topdress, Overseed lower field $ 36,000 New Roadway, turnaround and handicapped parking $108,000 (Cost considerations for every $100K added equals $1.63/year/average house)
Next Board of Education Meeting January 22 at 7 PM