Public Works Department . Wisler Pierre-Louis, P.E., LEED AP BD+C, CFM, PMP Public Works Director. Mission Statement.
E N D
Public Works Department Wisler Pierre-Louis, P.E., LEED AP BD+C, CFM, PMP Public Works Director
Mission Statement Enhance the quality of life, health and safety of all residents by rendering proper and efficient sanitation, street, water, sewer, stormwater, fleet management, facilities maintenance and right-of-way maintenance services.
Organization • North Miami • 10 sq. mi., NE Miami-Dade • 60,000 residents • Service Area • 90,000 residents • 22,000 connections • Staffing • 500 employees city-wide • 150 employees in PWD
Winson WTP Upgrades • Well Rehabilitation • Filter Rehabilitation • WTP Improvements • Accelator • Sludge Basin • Clearwell • New Administration Building • Transfer and High Service Pumps • New Storage Tanks
Winson WTP Upgrades • Well Rehabilitation
Awards • FSAWWA Region VII – Best Tasting Drinking Water • 2014 – 1st Place • 2013 – 1st Place • 2009 – 1st Place • FSAWWA State Drop Savers Poster Contest • 2014, Division 5 – 3rd Place
Miami-Dade County Consent Decree • Sewer Overflow Response Plan • Information Management System Program • Sewer System Asset Management Plan • Gravity Sewer System O&M Program • Pump Station Operations & Preventative Maintenance Program • Force Main Operations & Preventative Maintenance and Assessment/Rehabilitation Program
Recently Completed Projects • Biscayne Blvd. Force Main Project • NE 131st ST Force Main Project • NW 2nd AVE Force Main Project
Biscayne Blvd. Force Main Project • 7,000 LF of 12-inch DIP • Contractor: JVA Engineering Contractor, Inc. • Engineer: EAC Consulting, Inc. • Cost: $1,586,000 • Start: 8/2014 • End: 3/2015
NE 131 ST Force Main Project • 3,100 LF of 16-inch DIP • Contractor: Roadway Construction, LLC. • Engineer: Kimley-Horn and Associates • Cost: $694,000 • Start: 9/2014 • End: 6/2015
NW 2 AVE Force Main Project • 1,600 LF of 10-inch DIP • Contractor: Roadway Construction, LLC. • Engineer: Kimley-Horn and Associates • Cost: $375,000 • Start: 10/2014 • End: 6/2015
Projects in Design • NE 6 AVE Water Main • NE 16 AVE Water Main • Hospital Pump Station • San Souci 1 Pump Station • San Souci 3 Pump Station
Upcoming Projects • Sanitary Sewer Lining and Rehabilitation