250 likes | 343 Views
2010 Summer Projects. Human Health Building. 5 th Floor. Walton Road. 4 th Floor. 3 rrd Floor. 2 nd Floor. 1 st Floor. Human Health Building. Walton Road. P-3. Human Health Bldg. Human Health Bldg. Geo Thermal Wells in P-1. P-1. Human Health Building.
E N D
Human Health Building 5th Floor Walton Road 4th Floor 3rrd Floor 2nd Floor 1st Floor
Human Health Building Walton Road P-3 Human Health Bldg Human Health Bldg Geo Thermal Wells in P-1 P-1
2010-2011$11 M Infrastructure • North Loop HTHW Tunnel - Wilson Boulevard • UTS O’Dowd Hall Server Room and Voice of IP • O’Dowd Hall Curtain Wall
Walton Road North Loop HTHW Trench Tunnel UTS Server Room Squirrel Road
Potential Projects Summer 2010 • Paving – Parking Lots, Entrances & Roads • Squirrel Road Repairs (Walton to Featherstone Road) • Sidewalks • Roofing – ODH, CHP and DHE • Storm Water (tied to a Grant request) • Elevator – WH • Wilson Blvd North Loop HTHW Tunnel • ODH UTS Server Room and Voice over IP (Internet Protocol) • P-1 Light Pole & Fixture Replacement (DTE Grant) • Mechanical System Replacement/Repair
Walton Road Summer 2010 Parking Lot and Entrance Changes Squirrel Road
Walton Road 1 Squirrel Road
Walton Road 1 2 Squirrel Road
Walton Road 1 2 Squirrel Road 3
Walton Road 1 2 4 Squirrel Road 3
Walton Road 5 1 2 4 Squirrel Road 3
Walton Road P-11 6 5 1 2 4 Squirrel Road 3
Walton Road P-11 6 5 1 2 4 Squirrel Road 3 7
Walton Road P-11 8 6 5 1 2 4 Squirrel Road 3 7
Walton Road P-11 8 6 5 1 2 4 Squirrel Road 3 9 & 10 7
Walton Road P-11 8 6 5 1 2 4 Squirrel Road 11 3 9 & 10 7
Walton Road P-11 8 6 5 1 2 D 4 Squirrel Road 12 11 3 9 & 10 7
Walton Road P-11 8 6 5 A 1 2 D 4 Squirrel Road 12 11 3 9 & 10 7
Walton Road P-11 8 6 5 A 1 2 D 4 Squirrel Road 12 11 3 B 9 & 10 7
Walton Road P-11 8 6 5 A 1 2 D 4 Squirrel Road 12 11 3 C B 9 & 10 7