200 likes | 222 Views
Individul Project: NPD-NET. Component 4: Integration and Regional Adaptation of NPD Roadmap Kick-off meeting Region of Central Macedonia – URENIO Research Unit Thessaloniki 3-4 June 2004. NPD Roadmap Basics. New Product Development Roadmap.
E N D
Individul Project: NPD-NET Component 4: Integration and Regional Adaptation of NPD Roadmap Kick-off meeting Region of Central Macedonia – URENIO Research Unit Thessaloniki 3-4 June 2004
NPD Roadmap Basics New Product DevelopmentRoadmap. Is a tool that can help companies and organizations to successfully develop new products or upgrade existing ones through a series of logical steps, starting from the process of idea generation and ending at the launch of the product into a market. This kind of roadmap is usually based on the model developed by Dr. Robert G Cooper and it is known as Stage – Gate Process.
Component 4 Goals • Enrichment of the existing NPD Roadmap by Lead Partner. • Preparation and adaptation of the new NPD Roadmap interface according to the needs of NPD-NET. • Insertion of material of local interest (local success stories, best practices, existing NPD support services) by partners. • Web development of the finalized form of the NPD Roadmap.
Existing Roadmap Structure L1 A1 L2 A2 L3 A3 L4 A4 L5 • Existing NPD Roadmap has 5 “Levels” and 4 “Assessment points”. • The available Levels are: L1: Idea Generation, L2: Idea Selection and Concept Development, L3: Product Development, L4: Product Testing and Validation and L5: Product Launch. • Each Level contains the problem definition that a company faces at the particular point of NPD, one or more than one solution to the problem, available tools and methodologies to tackle the problem, case studies, best practices and existing resources and references. • Each Assessment (A1,2,3,4) contains a series of questions regarding the work done in the previous Level. Depending on the answers given a Go – Kill or Hold the NPD process recommendation is given.
Product Testing Product Launch Idea Selection Product Development Levels Schematic Approach Idea Generation
New Roadmap Structure Proposal • Assessment to be added at the end of Level 5 “Product Launch”. • More tools and methodologies centered in a more practical than theoretical approach to be added in all Levels. • Practical / real local applications of parts or of the whole roadmap in specific areas or industries to be added by the partners. L1 A1 L2 A2 L3 A3 L4 A4 L5 A4
Description: Generation of new ideas There are many techniques and tools Internal & external sources Requires a person who will collect the proposed ideas Solution: Gather as many ideas as possible using the tools available Tools: Conjoint Analysis QFD Brainstorming Competitive intelligence Tools / Techniques to be added: Specific methods of Brainstorming such as “Listing & Mapping”, “Structured and Unstructured Brainstorming” etc. Practical ways of performing CI such as the “CI Benchmarking Tool”. Level 1. Idea Generation
Level 1 Block Diagram Theoretical Background Level 1 Tools Conjoint Analysis QFD Competitive Intelligence CI Benchmarking Brainstorming Listing – Mapping Structured Unstructured
Description: Screening of new ideas vs customer needs, strategic goals, profits – sales. Product concept development. Cross functional team setup. Preliminary development setup. Tools: SWOT Analysis Qualitative & Quantitative research Cost Benefit Analysis Tools / Techniques to be added: Function – Value analysis. Return of Investment prediction – analysis. Practical ways of designing, conducting and analyzing Qualitative and Quantitative Research depending on the size of the company. Level 2. Idea Selection and Concept Development
Level 2 Block Diagram Theoretical Background Level 2 Tools Qualitative Research Real examples of implementation of all tools using templates, success stories, best practices and case studies. Quantitative Research SWOT Analysis Cost Benefit Analysis Function-Value Analysis Return of Investment
Description: Develop new product according to product concept Solution: Implementation of the action plan for product development Setup an R&D environment, R&D Management, and locate and implement R&D financing. Design prototypes. Design testing methods. Design – setup manufacturing – production methodology. Tools CAD/CAM Reengineering Reverse Engineering Industrial Design Tools / Techniques to be added: Design for Cost. Design for life cycle. Design for manufacturability. Design for the environment. Implementation of R&D metrics. Implementation of Portfolio management. Failure mode – effects analysis (FMEA). Bill of material management. Outsourcing implementation (statement of Work – SOW). Level 3. Product Development
Level 3 Block Diagram Theoretical Background Level 3 Tools Design for Cost R&D Techniques Design for Life Cycle CAD/CAM Design for Manufacturability Design for the Environment Portfolio Management R&D Metrics Implementation Failure Mode – Effects analysis Reverse Engineering Bill of Material Setup Industrial Design Methods Industrial Design Of operations - processes Reengineering Of competitor / own products
Description: Construction of prototypes and testing. Solution: Construct Prototypes. Conduct prototype testing. Alpha testing, Beta testing, Market testing. Compare test results against product concept and market plan. Tools: Rapid Prototyping Rapid Tooling Rapid Manufacturing Information and design tools are going to be added for the setting up and implementation of lab – R&D environment prototype tests, of small and large scale market prototyping tests and ways of comparing the results vs the product concept and market plan that were formed in Level 2. Level 4. Product Validation - Testing
Level 4 Block Diagram Theoretical Background Level 4 Tools Rapid Prototyping RP methods Rapid Tooling Rapid Manufacturing Design and implementation methods of all tests available Alpha – Beta Tests Market Tests
Description: Decide where, when, and how to introduce the new product into a market. Launch product Tools: Human Resources Management Supply Chain Management Outsourcing Benchmarking Tools / Techniques to be added: Advertising & Promotion Setup. Critical Path Scheduling. Product life Cycle Design. Intellectual Property Management. Risk Management. Distribution Channel Setup. Level 5. Product Launch
Level 5 Block Diagram Theoretical Background Level 5 Tools Human Resources Management Supply Chain Management Outsourcing Benchmarking Advertising & Promotion setup Distribution Channel setup Product Life Cycle Design Risk Management Critical Path Scheduling Intellectual Property Management
Things to Note on the New NPD Roadmap Structure • Human Resources Management, Outsourcing, Supply Chain management and Benchmarking were inserted in original Roadmap in Level 5. In the new Roadmap the 1st three will have applications in all Levels. The 4th one will be applied optionally before starting Level 1 and after completion of Level 5. • Some of the tools mentioned already exist and some are to be added in the next period of time. But as the work of component 4 progresses more tools / techniques are to be added depending on the needs and actual applications of the Roadmap on the Local and Regional Level. • Component 3 information on both Supply and Demand side can alter the structure of parts or Levels or whole Levels of the Roadmap. • All existing Assessments plus the one that will be added at the end of Level 5 will be altered so that they can reflect and represent the new Roadmap structure.
Timeline of activities • Technical Annex Component 4 – July 2004 • Roadmap interface – the multilingual software environment which will host the whole material – September 2004 • Enrichment of existing roadmap material with technical and academic material (URENIO) – by October 04 • Translation of material in local languages (for Basque Country define it) – by January 2005 • Material of local interest in English and local language – by April 2005
Timeline of activities • Material of others in local languages (define it in the respective SC meeting) • Web roadmap finished - by July 2005
Information • Existing Roadmap can be found at http://center.innothessaly.gr • Some service providers on product innovation tools that can be applied to the tools of the Roadmap can be found at http://portal.e-innovation.org/services_tools.aspx?Cat=Product