250 likes | 389 Views
BGREI In Eastern UP (Meeting Central Steering Committee 20 Dec 2013). Achievement in 2012-13. Agenda-(a). Achievement in 2012-13. Agenda-(a). Impact of project on productivity. Agenda-(a). Impact of project on productivity. Agenda-(b). Strategies adopted for Site specific activities.
E N D
BGREI In Eastern UP (Meeting Central Steering Committee 20 Dec 2013)
Achievement in 2012-13 Agenda-(a)
Agenda-(a) Impact of project on productivity
Agenda-(a) Impact of project on productivity
Agenda-(b) Strategies adopted for Site specific activities • Included activities are: • Distribution of Drum seeder • Tractor Driven Paddy Thresher • Mini combined harvester • Line Sowing
Agenda-(b) Strategies adopted for Site specific activities Distribution of Drum seeder- Total Drum Seeder distributed- Under Demonstration - 161 Out of Demonstrations – 369 (includes 99 demonstration out of BGREI districts but in Eastern UP which was distributed before finalization of project by GoI)
Agenda-(b) Strategies adopted for Site specific activities Tractor Driven Paddy Thresher and Mini combined harvester
Agenda-(b) Demonstration of Line Sowing of Wheat • An area of 156020 has been covered under the target of 156020 ha. • Photography and video graphy of the activity is being under taken. • Wide publicity of the programme is ensured through visit of near by farmer.
Agenda-(b) Marketing support-Community farm storage building • The groups organized under ATMA and by others will take care of additional funds, storage of grains and disposal in time of demand. • Joint Director Agriculture Engineering has been instructed to ensure the quality of construction of these storage building.
Agenda-(b) Marketing support-Contd…. • Seed dryer • Seed grader • Portable bag closer • Weigher with compressor
Physical and Financial achievement during the year 2013-14 As on 10 Dec. 2013 Agenda-(c)
Agenda-(c) Efforts in increasing procurement and storage especially for Eastern UP • Food and civil supply department of UP is fully geared to procure all arrivals of paddy in view of increasing production by way of arranging required gunny bags, weighing equipments coupled with sufficient liquidity. • Involvement of commission agent to cope up higher arrivals. • Payment to beneficiaries through RTGS.
Agenda (d) Procurement (Paddy) Scenario in retrospect and prospect
Agenda (d) Hybrid Rice being distributed in Uttar Pradesh 2013-14 All notified hybrids were distributed
Scenario of Hybrid and General seed Distribution 2013-14 (Qtl) Additional Agenda
Coverage under Hybrid and other varieties Additional Agenda 17-12-13 Area in ha.
Problem Faced in procurement of Hybrid paddy Additional Agenda 17-12-13 • Most of the millers complain about the less recovery in hybrids. • Government of India has informed that Indian Institute of Crop Processing Technology Tanjaure, Tamilnadu has been authorized to take study on this issue. Government of UP is fully geared to participate in the study.
District wise Rice procurement Target (MT) Additional Agenda 17-12-13
District wise Rice procurement scenario (in retrospect of prospects) (MT) Additional Agenda 17-12-13
Agenda (e)-Results of crop cutting of different Eco system of BGREI demonstrations of plots conducted during Kharif 2013 • The crop cutting results from different districts under different eco system are being analyzed. However, overall scenario is summarized.
Statement of Financial progress under BGREI vs Utilization certification issues in different years Additional (e) page -2 Contd…
Statement of Financial progress under BGREI vs Utilization certificate issued in different years Additional (e) page -2 Continued from previous slide The final (revised) physical and financial progress for the year 2010-11 submitted to GoI also includes achievement made during 2011-12 against the target for 2010-11. As such the financial progress reported along with physical progress is higher as compared to utilization certificate. Similarly, the amount shown in utilization certificate during 2011-12 is more than the amount shown in physical and financial report because the amount spent against physical and financial target for 2010-11 has been booked in the year 2010-11 in stead of 2011-12