An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integra E-Quip Integrating the design, procurement & asset-management process http://www.E-Quip.uk.net

  2. The Procurement Process The E-Quip Gap Design & Briefing Procurement Asset-Management

  3. Inputs to the Process • a) BOQ’s – Lists of the equipment you need. These can come from: • Briefing & design tools • ADB • CodeBook, … • Spreadsheets • b) Transfer Lists – Lists of existing equipment that can be transferred. These can come from: • Asset-management tools • Optim EMS • EMAT, HECS, SEMS, … • Spreadsheets • You need to purchase (a - b)

  4. Outputs • Equipment has been purchased efficiently, economically & commissioned on-time, and is available for use. • Lists of new equipment must be passed on to an asset-management system. • Transferred equipment must be updated in the asset-management system to reflect its new locations. • Decommissioning jobs must be raised for transferred assets. • Commissioning jobs must be raised on new & transferred assets.

  5. The Challenge • None of these IT tools communicate with each other. • The nomenclature used at each stage is different for equipment & locations: • “MON013 – Patient Monitor” • Philips Medical Systems M8007A • Philips MP70 • At the design stage there are many locations, at the asset-management stage there are fewer. • “Ward 3” in the asset-management system may cover 20 locations in ADB (bays, clean utility, dirty utility, staff changing, WC’s, …) • How is the process being managed & monitored? • Given target dates & product lead-times, when should tenders & orders be raised? • Is there one central repository for all of the supporting information, such as equipment specifications, target dates, product lead-times, suppliers etc? • “What-if” Equipping – costing scenarios

  6. What is Missing from the Picture? • 1. Communication • All of these systems need to talk to each other. • The output of design is the input to procurement. • The output of procurement is the input to asset-management • 2. Process Control • What’s happening, what should happen next, how are we doing? • Deadline & Target Management • Project phase completion dates. • Target commissioning dates. • Product lead-times. • 3. Nomenclature Mapping • Design, procurement & asset-management will almost certainly use different names for: • Equipment • Models • Locations • 4. Virtual Design: • Preparation of PFI bids and tenders. • Costing scenarios.

  7. Supporting Data If systems are to communicate they need some common data: • 1. Procurement pivots around Generic Specifications. • The basis for tenders • Specifications need to be linked to: • Suppliers • Equipment Models & Options • Equipment Categories • ADB/CodeBook components • Briefing & design systems are not the place for generic specifications – unless you want thousands of “900-Series” components. • 2. Mapping Information • Equipment • Locations • 3. Key Dates, Targets & Deadlines

  8. What does E-Quip do? • 1. It manages the process flow. • The procurement process is essentially a transition from generic to specific: • You need (generic): “1 x MON001 Patient Monitor” • You buy (specific): a “Philips MP70” and two modules: the “M3001A” multi-measurement server and the “M1026A” anaesthetic gas module • A single generic item has become multiple specific items • This process will involve issuing tenders (linked to Generic Specifications), receiving & evaluating quotations, raising orders & accepting equipment deliveries.

  9. What does E-Quip do? • 2. It enables communication between the key systems involved in the procurement process. • E-Quip can create asset-management system records (both equipment & jobs) based on design or procurement information. • This would, for example, allow an EBME or Medical Physics department to start planning the resources required to commission equipment before it has actually been purchased. • It can read information from design, asset-management & procurement systems. • There is no need to re-enter data.

  10. What does E-Quip do? • 3. It provides a store for the common data required throughout the procurement process. • Generic Specifications. • Equipment Models & Options. • Tenders, Orders & Deliveries. • Key Dates. • 4. It provides nomenclature mapping. • Equipment • Locations

  11. What does E-Quip do? • 5.Virtual Procurement • Equipping scenario comparison. • Automated model selection based on quality & suitability. • 6. It can assist in taking inventories of current assets: • Do the inventory in Microsoft Excel • Import to E-Quip • Export to Optim EMS

  12. What it Doesn’t do! • E-Quip is a process management tool, it is not: • … a replacement or competitor for any of your existing systems, such as ADB, CodeBook etc. • … an E-Procurement system • It is not supplied with data • (except equipment categories) • E-Quip does not force you to use a particular design or asset-management system. • It is not expensive!

  13. Communication • Your equipment requirements will have been entered in a briefing or design system, such as ADB, CodeBook or perhaps simply using spreadsheets. E-Quip can read this information. • This information must then be passed to your purchasing system. E-Quip can export this information. • The items you buy must eventually be registered on your asset-management system. E-Quip can automatically create these assets on Optim EMS, or can export them to other systems. • You will probably raise jobs on Optim EMS to decommission transferred assets, and commission new equipment. E-Quip can automatically create these jobs on Optim EMS. • You may have lists of equipment models, equipment categories & suppliers in your purchasing or asset-management systems. E-Quip can read these.

  14. Nomenclature Mapping • Different nomenclatures are used throughout the process: • This is important when deciding what can be transferred • “MON001 Patient Monitor” • “Vital signs monitor” • “Monitor, physiological parameter” • “1-G-08-05 MULTI-PARA TRANSPORT MONITOR: - NIBP,SAO2,ECG,TEMP,IBP” Are these all the same thing? • The “granularity” of locations is finer in design systems than it is in asset-management systems: • An asset-management system might record an asset as being in “Ward 3”, regardless of where it actually is within Ward 3.

  15. Process Management • E-Quip provides an “at-a-glance” status view of an entire project • What has been ordered, delivered, commissioned etc. • Comparisons with target dates for • Tendering • Ordering • Delivery • Decommissioning (of transferred assets) • Commissioning • Sign-Off

  16. Equipping – “Virtual” Procurement • Carried out in advance (possibly several years) of actual procurement • Normally performed for financial analytical purposes • Preparation of a PFI or managed services bid • Predicts an approximate cost (based on current prices) and provides a justification for that cost • Moves from generic to specific, but would not normally result in tenders or orders being raised • i.e. Nothing will actually be purchased • Allows “what-if” scenario planning • What will be the likely cost if we choose high-end Philips monitoring, mid-range infusion devices and low-end Wolverson X-Ray?

  17. Core Data Types • Domains • Local: data held somewhere on your LAN • Remote: data located on any E-Quip system, anywhere in the world, via the Internet • Categories • Structured equipment descriptions • Generic Specifications • A manufacturer-independent description of device functionality. Tenders are normally based on generic specifications • Models • A manufacturer-specific item of equipment • Model Options • Additional manufacturer-specific equipment that extends the basic functionality of a model • Suppliers

  18. Project-Specific Data • Equipment List (BOQ) • The heart of the system • Initially a list of what you need • Ends up as a list of what you have • E-Quip is all about managing that transition • Briefed Equipment • Provides the link to ADB, Hiltron, CodeBook etc. • Assets • Provides the link to an asset-management system (Optim EMS) • Asset Pools • For assets that you have lots of (beds, outlets etc) • Tenders, Quotations, Orders, Deliveries • Manages the purchasing process

  19. Cross-Project Data • EMS Models • Can be imported from your asset-management system • Belong to either a single project, or all projects. • Used when creating new assets on Optim EMS • EMS Locations • Asset-management locations can be less-specific than design locations

  20. The BOQ - at the Heart of E-Quip • The left-hand side of this screen is the most generic, while the left-hand side is the most specific. E-Quip is all about completing the right-hand side of this screen

  21. A BOQ in Various Stages • At the end of the process you will have purchased (or transferred) everything on this list, and assets will have been created in your asset-management system, optionally with jobs raised to commission new equipment and to decommission transferred items • This screen gives you an “at-a-glance” overview of the current state of the entire project