1 / 5

Design a Package Suitable for Exporting the Southern Rock Lobster to Asia.

Design a Package Suitable for Exporting the Southern Rock Lobster to Asia. How do families catch crayfish in South Australia?. Here is a clip to show how it happens? Companies that export huge amounts of crayfish do it in the same way but with many more craypots.

sumana
Download Presentation

Design a Package Suitable for Exporting the Southern Rock Lobster to Asia.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design a Package Suitable for Exporting the Southern Rock Lobster to Asia.

  2. How do families catch crayfish in South Australia? • Here is a clip to show how it happens? Companies that export huge amounts of crayfish do it in the same way but with many more craypots.

  3. Visit this website to learn more about exporting live crayfish... http://www.southernrocklobster.com/industry/exports/liveexports.aspx

  4. Your brief... Design and construct a container that has the dimensions (l) 35cm x (h)15cm x (w)15cm. For the crayfish to arrive in Asia alive and in perfect health, the container must be both protective and insulated. To test the suitability of your design it will be tested in two ways. • 2 ice cubes will be placed inside and these must stay frozen for as long as possible. • The container will have a raw egg put inside and dropped from 1.5m. The egg should not break or crack.

  5. Timeline Week 2 - Introduction and design. Week 3-4 - Collect suitable materials and build Week 5 - Testing Week 6 - Appraisal and evaluation

More Related