An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kick-Off Meeting, Day 2 Apr 12, 2011 Pullman, Washington

  2. Break-Out Discussions

  3. Potential Topics for Break-Out Discussion • Integration of stand-alone models • Cyberinfrastructure • Economics • Communications and Outreach

  4. Integration of Stand-Alone Models • Degree of integration/coupling • 1-way (loose coupling) • Iterative coupling • Tight coupling • States/fluxes to pass between various models • Model rebuilding, simplification, or code translation?

  5. Model Space/Time Domains

  6. Cyberinfrastructure Needs • Code Versioning Software • subversion, cvs, git • Data Storage • DateOne, HDF • Cluster Software Support • Virtualization, MapReduce, Hadoop • Document Sharing • DropBox, SharePoint, Google Group, code.google.com • Videoconferencing • Evo, MeetingPlace, LiveMeeting (MS), BigBlueButton, SharePoint, Elluminate, Adobe Connect, Skype Refer to details in memo by Joe Vaughan

  7. Group Discussion on Project Integration

  8. Timeline • Major milestones for entire 5-year project duration (see hand-out of project milestones) • Specific milestones for first year: need to determine • Design milestones to match specific objectives • 1-way land/atmosphere impacts • 2-way land/atmosphere impacts/feedback • Feedbacks with human decision making (economics) • Communications and outreach

  9. Working Groups • Need to discuss what working groups will look like • Working groups will change throughout project duration • Initial working groups will be formed to accomplish first year milestones

  10. Meeting Frequency • Steering committee meetings • Bi-monthly in early stages, eventually monthly? • All faculty participants invited • Working group meetings: weekly to bi-monthly • All-faculty meetings: quarterly? • All-participant meetings (faculty&students): bi-annually? • E.g., Kick-off meeting, poster presentations, etc.. • Peer review meetings: annually? • Outreach Meetings: bi-annually to annually?

  11. Concluding Remarks