NPC Meeting Boston, MA November 7, 2003. Stephen G. Whitley Senior Vice President & COO. Agenda. System Operations Market Operations Blackout Update Winter Outlook Back-Up Detail. System Operations. Operations Highlights. Boston & Hartford Weather Pattern:
E N D
NPC Meeting Boston, MA November 7, 2003 Stephen G. Whitley Senior Vice President & COO
Agenda • System Operations • Market Operations • Blackout Update • Winter Outlook • Back-Up Detail
Operations Highlights • Boston & Hartford Weather Pattern: • Rainfall conditions for the month were above normal; Temperatures throughout the region were slightly below normal; and, 1” – 2” of snow reported on October 23, 2003. • Peak load of 19,167 MW at 17:00 hours on October 16. • During October: • Solar Magnetic Disturbances (plus K-7) on October 24 and October 29 – 31. • M/S2 declared on October 24 – 25 and October 29 - 31 due to Solar Magnetic Disturbances. • Minimum Generation declared (New England wide) on October 1.
Congestion Marginal Loss LMP Day-Ahead LMP Average by Zone & Hub: (4.13) (1.72) (-1.35) (-2.00) (0.02) (-1.09) (-2.47) (-5.39) $/MWh Data Period: October 1 – 26, 2003
Congestion Marginal Loss LMP Real-Time LMP Average by Zone & Hub: 97.4% (1.24) (1.47) (0.06) (-2.07) (-2.49) (-0.95) (-1.72) (-5.80) $/MWh Data Period: October 1 – 26, 2003
Day Ahead Market vs. Forecast Load * Note: Data for October* Oct. 1-24, 2003 *
Real Time LMP Real-Time LMP for October 1 - 24, 2003 175 CT Import interface constrained due to Evening peaks coupled with tight CT capacity conditions. capacity conditions are coincident with the higher price spikes. 150 Canal and ORR-SO interfaces constrained. 8909B-1 125 Line constrained for loss of the 348 Line with a stuck 14T breaker at Millstone. E183E-4 Line constrained for loss of the 332S contingency (332 Line with a stuck breaker.) 100 $/MWh 75 50 25 0 10/01/2003 01 10/03/2003 01 10/05/2003 01 10/07/2003 01 10/09/2003 01 10/11/2003 01 10/13/2003 01 10/15/2003 01 10/17/2003 01 10/19/2003 01 10/21/2003 01 10/23/2003 01 Day INTERNAL_HUB CONNECTICUT MAINE NEMASSBOST NEWHAMPSHIRE RHODEISLAND SEMASS VERMONT WCMASS
Settlement Data – Real Time & Balancing Market Percentage of Real-Time Load Fully Hedged Through ISO-NE Settlement System* Note: Balancing Market - This MW amount is after Day Ahead hedging and Internal Bilateral Transactions. It is a Participant Pool Total and does not consider locational pricing.
Blackout Update • Reliability Committee will meet the beginning of December, 2003. • Review facts from the 2003 Blackout • Discussion of “Lessons Learned Session” for New England.
Winter 2003-04 Capacity AssessmentLeast Operable Capacity Margin - Week beginning November 1st MW Projected Peak (50/50) 18,820 Operating Reserve Required 1,700 Total Operable Cap. Required 20,520 Projected Capacity 32,590 Assumed Outages 7,600 Total Capacity 24,990 Operable Capacity Margin 4,470
2003 Capacity AssessmentLeast Operable Capacity Margin - Week beginning November 1st MW Projected Peak (90/10) 19,580 Operating Reserve Required 1,700 Total Operable Cap. Required 21,280 Projected Capacity 32,590 Assumed Outages 7,600 Total Capacity 24,990 Operable Capacity Margin 3,710
New Generation Update • No new resources were added in October. • Status of Generation Projects as of October 31, 2003: No.MW In Construction 2 521 with 18.4 approval Not in Construction 6 1,444 with 18.4 Approval
2003 Capacity AssessmentLeast Operable Capacity Margin - Week beginning November 1st MW Projected Peak (90/10) 19,580 Operating Reserve Required 1,700 Total Operable Cap. Required 21,280 Projected Capacity 32,590 Assumed Outages 7,600 Total Capacity 24,990 Operable Capacity Margin 3,710
Active: 434 Assets 340.3 MW Pending: 5 Assets 1.4 MW Zone Assets RT Price RT 30-Min RT 2-Hour Profiled * Assets RT Price RT 30-Min RT 2-Hour Profiled * CT 119 27.0 61.6 1.1 57.8 2 0.0 0.6 0.0 0.0 SWCT** 54 7.7 26.4 1.1 0.2 2 0.0 0.6 0.0 0.0 ME 4 0.4 0.0 0.0 76.0 NEMA 114 62.9 3.1 0.8 1.4 3 0.0 0.2 0.6 0.0 NH 1 0.0 0.4 0.0 0.0 RI 12 1.9 0.0 0.0 0.0 SEMA 72 7.4 0.5 0.0 0.0 VT 16 7.1 1.3 0.0 5.9 WCMA 96 9.7 4.8 2.3 6.9 Total 434 116.4 71.8 4.3 147.9 5 0.0 1.4 0.6 0.0 Demand Response(as of October 31, 2003) * Includes former Type 2 - Interruptible Loads ** SWCT assets included in CT values (SNEW 7 was in 2-Hour, now retired)