1 / 17

GEM based TRD R&D Progress report

GEM based TRD R&D Progress report. Physics Simulations and eSTAR Letter of Intent Funding support from NSF China starting 2014 Regular GEM R&D Manpower and plans. Zhangbu Xu (BNL) Ming Shao (USTC/China). 6. October 2013: submitted to BNL.

tahlia
Download Presentation

GEM based TRD R&D Progress report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GEM based TRD R&D Progress report Physics Simulations and eSTAR Letter of Intent Funding support from NSF China starting 2014 Regular GEM R&D Manpower and plans Zhangbu Xu (BNL) Ming Shao (USTC/China)

  2. 6. October 2013: submitted to BNL Ernst Sichtermann reported to the STAR council in 09/19/2013

  3. eSTAR Baseline Detector Configuration https://drupal.star.bnl.gov/STAR/node/27990 Fig.3.2

  4. eSTAR Kinematic Coverage Figure 3.1: DIS kinematics of scattered electrons and jets with STAR existing detector coverage.

  5. Detector Acceptance and Resolution

  6. Resolution and Capability

  7. Semi-inclusiveMeasurements Azimuthal correlations indi-hadron(semi-inclusivedeep-inelasticscattering) measurements, e+Aue’+ Au+h1+h2+X providesensitivity to gluonsandhavebeenproposedasarobustprobeof saturation: Fig.2.6 Why not flow, flux tube and multiplicity dependence? – E. Shuryak eSTARprojections for 10GeVelectronsscattering off 100GeV/nucleonAubeams,1 fb-1.

  8. Exclusive Vector Meson Production TRD+iTPC eSTARadvantanges: t resolution (2.5%) low-momentum PID around mid-rapidity Mesons such as  or ρ, which have large wave functions, are anticipated to be considerably more sensitive to the saturation effect.

  9. On-going R&D Projects • iTPC Designreduce material and padrow arrange • Forward Calorimeter System (FCS)W-power+Fiber • Crystal Calorimeter (BSO)new crystal • GEM based TRDnew TRD

  10. eSTAR Executive Summary • In this Letter of Intent, the STAR collaboration proposes a path to evolve STAR into a major experiment, referred to as eSTAR, at a possible future Electron-Ion Collider (EIC) at Brookhaven National Laboratory, eRHIC. • We demonstrate through simulations that eSTAR will deliver on a broad range of key measurements: • inclusive structure functions in (polarized) electron-nucleon and electron nucleus scattering, • semi-inclusive observables that have one or more identified particles in the current fragmentation region and dihadron correlations in the low-x regime, • exclusive observables in deeply-virtual Compton scattering and in vector meson production processes, including diffractive processes. These measurements have been identified as flagship science cases in the recent EIC community white-paper for the eRHIC facility specifications envisioned in the charge for this LOI. • The baseline eSTAR plan has three essential upgrade projects for the scientific program: Endcap TOF, GTRD, CEMC • eSTAR will rely on a replacement upgrade of iTPC and on a subsequent forward upgrades (FCS and FTS) for completing of STAR’s high-priority programs at RHIC • The majority of the collaboration is strongly supportive of the eSTAR effort and multiple institutions are already actively engaged in simulations and R&D for each of the envisioned upgrade projects. • The detector configuration presented in this Letter of Intent represents the baseline instrument. New collaborators from the broader community are vitally important. Science-driven proposals to further strengthen the baseline eSTAR scientific capabilities and program, are particularly welcome.

  11. Active area: 30*30 cm2 Triple layer standard GEM foils from CERN New stretching method – NS2, easy repair and replace of the GEM foils Large size GEM construction Explore in more detail the tradeoffs between the TGEM approach and using more traditional foil-based GEMS instead. As a material G-10 remains a bit of a wild card particularly in large areas. -- Committee Q#3,4 -- Ming Shao (USTC)

  12. Prototype Construction Detector base plane GEM foil with NS2 frame NS2 frame Finished detector -- Ming Shao (USTC)

  13. Detector test Low Pass Filter Test setup HV test HV Detector Copper shield X-ray source & support Gas Detector base plane (rear) rail Thinned spot X-ray source & support GEM detector radiated by a Copper k-edge X-ray source through the thinned spot on the base PCB -- Ming Shao (USTC)

  14. Test Results Uniformity: energy resolution ~ 20-25% (ok) gas gain ~100% larger near the edge than in the central (not good) Over-stretching? MCA recorded spectrum 2nd version with improved NS2 design Under further improving ~15-18% -- Ming Shao (USTC)

  15. Committee Report (Q#1) Impact at high eta (-2>>-4)1. Kinematic values mainly from crystal calorimeter 2. Charged hadron background rejection vs photon conversion background 3. Current available detector R&D and simulation efforts 4. Current configuration as baseline, welcome new efforts On page 25 a new small angle “Inner TPC (or other technology?) tracker is shown. This apparently adds ~30% hits to the tracks. The Committee requests more clarification about such small angle tracking. What would be the plan for this? g/e h/e 0.1 1 10 pT (GeV/c)

  16. Committee report (Q#2) What will be the effect of additional inner sector TPC electronics on the performance of this and other downstream devices? iTPC upgrade goals • Extend eta coverage • Increase dE/dx resolution • Increase low-pt coverage • Reduce material in fiducial volume <~10% X0readout electronics along the TPC wheels Currently up to 30% X0 behind TPC sector

  17. Summary and Plan • Accomplishments and Plan • Physics Simulations and LoI • Fund support from NSF China for GEM based TRD • Regular GEM study starts in China • Continue small TRD R&D at BNL postdoc: Prepare for new gas box,test beam different foils simulations • Several Changes since last review: • eSTAR document June—October • New fund for effort • Proposed joint MTD/TRD postdoc (50/50%) Offer in process • Beam test delay • Change of positions and responsibilities • Visa delay (student, professor)

More Related