An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tracker Cable and Cooling Pipe Mapping Linda Bagby

  2. Scope of Work • Generate Tracker maps for • Power and Control cables • Cooling Pipe • Format is currently in Excel spreadsheets • Needs to be downloaded into the ‘official’ database

  3. Map variables for each detector End Layer Sector (-TIB/-TID) Cooling Loop Control Loop Petal, String, Rod Arc Position TOB TEC TIB- TID- DEFINEDREQUIRED Power and Control Cable Map • End • Sector • Stack (Board) • Connector • Rack • Crate • Slot • Channel

  4. Map variables for each detector End Layer / Sector Control Ring Cooling Loop Arc Position TOB TEC- TIB TID DEFINEDREQUIRED Cooling Pipe Map • End • Sector (A / C) • Pipe designation • End • +/- X (Near / Far) • Detector • Inlet (A) / Outlet (C) • Flow Type • Position

  5. Resources • Engineering distribution: • Andrea Moggi • MARGHERITSA_FINALE-upd_ago_06.zip • PP1-Final-ver4-3_Tot-PIPES.xls • Nick Lumb • Tkges017b-modif 19october2005-a-4.pdf • TEC_pipes_Oct05.xls • Antti Onnela • TOB_cooling_manifold_and_feed-pipes_28072006.xls • Paola Tropea • 060719_Tkcooling_names.xls • 060714_SiStrip_lineNb.pdf • Mechanical distribution • Hans, Sabastian • services_distr15sept05.xls

  6. How many pipes per sector??? • Depends on who you talk to….. Engineering distribution based on A=Inlet and C=Outlet Range discrepancy: Working with TEC and TIB to resolve this issue. Hans distribution (looks like) it doesn’t follow same constraint Distribution discrepancy: Investigating why quadrant distribution doesn’t match Engineering for TEC, TIB, and TID—Mechanical constraints?? We are confident pipes can be arranged to meet 7 count limit.

  7. Summary • Documentation required • Power and Control Cable Map • Sector assignments for –TIB, -TID • Arc positions for TEC, -TIB, -TID • PP1 Connector Assignments • Electronics Crate, Slot, Channel assignment • Indexed cross-sectional drawing of PP1 input and output • Correspondence between arc positionPP1rack channel • Cooling Pipe Map • Arc positions for –TEC • Indexed cross-sectional drawing of PP1 input and output • Pipe plant from PP1cooling panel • Can only assign range now. • Pipe Count • Investigating discrepancies between Engineering and Hans pipe distribution. • Time Scale • Obtain required documentation by August 24. • Deliver maps by end of September.

  8. Back Up Material

  9. + Z Inlet Distribution

  10. + Z Inlet Findings • TOB • Total agreement with mechanical distribution. • TEC • +/- x positions verified. • Cooling panel pipe count includes historical spare. • TID/TIB • 10/14 sectors have different distributions. • 3 extra pipes assigned by mechanical group (mechanical constraints?)

  11. +Z Outlet Distribution

  12. + Z Outlet Findings • TOB • Total agreement with mechanical distribution. • TEC • 12/14 sectors have different distributions. • +/- x positions verified. • Cooling panel pipe count includes historical spare. • TID/TIB • 10/14 sectors have different distributions. • 3 pipe quantity reduction by mechanical group.

  13. + Z Sector Totals (A + C)

  14. - Z Inlet Distribution

  15. - Z Inlet Findings • TOB • Total agreement with mechanical distribution. • TEC • 12/14 sectors have different distributions. • +/- x positions verified. • Cooling panel pipe count includes historical spare. • TID/TIB • 14/14 sectors have different distributions. • 1 extra pipe assigned by mechanical group (spare?)

  16. - Z Outlet Distribution

  17. - Z Outlet Findings • TOB • Total agreement with mechanical distribution. • TEC • 12/14 sectors have different distributions. • Cooling panel pipe count includes historical spare. • TID/TIB • 10/14 sectors have different distributions. • 1 pipe quantity reduction by mechanical group.