1 / 7

FY08_HT-7 实验运行报告 运行二组 吴振伟,王华忠

FY08_HT-7 实验运行报告 运行二组 吴振伟,王华忠. 2008 年 3 月 12 日. 实验计划和内容. Avoidance of Current Termination using Runaway Electrons generated by Lower Hybrid Current Drive in HT-7 (9:00--15:20 ShotNo.99564-99617) (2) AC Operation (15:20--24:00 ShotNo. 99618-99675) (3) ICRF Boronization (0:00--)

tal
Download Presentation

FY08_HT-7 实验运行报告 运行二组 吴振伟,王华忠

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FY08_HT-7实验运行报告 运行二组 吴振伟,王华忠 2008年3月12日

  2. 实验计划和内容 Avoidance of Current Termination using Runaway Electrons generated by Lower Hybrid Current Drive in HT-7 (9:00--15:20 ShotNo.99564-99617) (2) AC Operation(15:20--24:00 ShotNo.99618-99675) (3) ICRF Boronization(0:00--) Shot#99564-#99675 Ip~80-150KA, ne~0.5-2.0E19m-3, It~2795-4130A(1.3T-1.94T) PLHCD~100-350kW, PIBW~20kW P外~2.1E-4Pa,P内~1.0E-5Pa

  3. Avoidance of Current Termination using Runaway Electrons generated by Lower Hybrid Current Drive in HT-7

  4. AC operation with LHCD and IBW (Ip=100kA,ne=1.2)PLHCD~200kW,PIBW~20kW

  5. AC Operation -Different particle confinement

  6. AC Operation — Density uncontrollable

  7. AC operation – improved density(Ip=100kA,ne=1.2,PLHCD~200kW,PIBW~20kW)

More Related