Hilton Central School District Capital Project Planning Team Kickoff Meeting December 14, 2011
Meeting Outline • Introductions • The Capital Project Planning Process • Determining Maximum Capital Project Size • Formation of Subcommittees • Resources for Subcommittees • Future Meeting Schedule
Capital Project Planning Process December 2011 – September 2012 September 2012 – January 2013 January 2013 – December 2014
Determining Maximum Project Size • Objective • A capital project that is substantially property tax neutral • Sources of Property Tax Offsets • Building Aid • approximately 90% of project cost • Capital Reserve Fund • $1.5 million • Reductions in annual operation costs • i.e. electricity produced by a wind turbine reduces annual utility costs
Sample Project Financing • $15 million project, financed with $1.5m paid by Capital Reserve, and $13.5m serial bonds (15-year bonds)
Subcommittee Resources • Building Condition Survey (BCS) • State required detailed architectural/engineering study of all facility infrastructure components, with estimated remaining useful life and cost of replacement • Programmatic Needs • Recommendations by Subcommittee Facilitator of building/department needs not covered by BCS • Go Green Committee Report • Preliminary study of alternative energy infrastructure needs to meet District goal of 50% reduction in use of commercially produced energy by 2015-16 school year
Capital Project Planning Committee WIKI • www.hiltoncppc.pbworks.com • Contains BCS for each building • Will be used for posting subcommittee minutes • Other materials will be posted as they become available