1 / 22

North Carolina Central University CM @ Risk Pre-Proposal Meeting

North Carolina Central University CM @ Risk Pre-Proposal Meeting School of Nursing Building Project SCO# 70720301 07/20/2009. Welcome to NCCU. Facilities Management / Design & Construction Services. Agenda.

tam
Download Presentation

North Carolina Central University CM @ Risk Pre-Proposal Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. North Carolina Central University CM @ Risk Pre-Proposal Meeting School of Nursing Building ProjectSCO# 70720301 07/20/2009

  2. Welcome to NCCU Facilities Management / Design & Construction Services

  3. Agenda • Introductory Remarks and RFP Review Mr. Tim McMullen, R.A. University Architect Director of Design and Construction Services • Review of Project Design – BBH Design • RFP Submittal – Eric Frazier, NCCU Project Manager • Site Tours • Questions and Answers • Closing Remarks

  4. Introductory Remarks & RFP Review Mr. Timothy F. McMullen, R. A. University Architect Director of Design and Construction Services

  5. NCCU – Yesterday and Today

  6. NCCU CAMPUS

  7. Chidley North Residence Hall Funding Source – Self-Liquidating General Information Project Budget: $30,000,000 Designer: Lord Aeck & Sargent Contractor: TBD Scope of Work: The project will involve major improvements to the Chidley Residence Hall Complex. The Annex will be demolished and replaced with a 125,000 ft² suite-style Residence Hall. The rooms in Chidley Main will be renovated to a traditional style. The new 520 bed Residence Hall will be constructed utilizing the Ben Ruffin Residence Hall as the basis for its design with the addition of a fourth floor. Renovations to Chidley Main will include the restoration of the west entrance and lobby facing campus and incorporation of meeting and activity rooms on the lower level. Current Status: In Design – DD Submittal

  8. New Parking Deck Funding Source – Self-Liquidating General Information Project Budget: $15,000,000 Designer: Neighboring Concepts Contractor: TBD Scope of Work: Construction of a 750 space multi-story parking deck with a Campus Police Substation. This project is part of Phase 1 of NCCU’s recently adopted Master Plan. The proposed deck will be built on the site of the Latham Residence Hall, which is slated to be demolished. The facility will also contain 10,000 ft2 of Retail Space. The University Bookstore is one of the projected retail outlets that may potentially occupy space in the facility. Current Status: - In Design - DD

  9. New School of Nursing Funding Source – General Fund and COPS General Information Project Budget: $25,000,000 Designer: BBH Design Contractor: TBD Scope of Work: Design and construction of a 65,000 ft² School of Nursing building to be located on the east side of campus between the Turner Law building, the temporary cafeteria, and Alston Avenue. The building will include classrooms, laboratories, office space, common areas, and infrastructure. Current Status: In Design – DD Submittal

  10. Review of Project Design BBH Design, Inc. Mr. Chetan Potdar Mr. Douglas J. Freeman

  11. RFP Submittal Eric R. Frazier – NCCU Project Manager

  12. RFP Submittal – Items of Note • Location of RFP: http://ariel.acc.nccu.edu/bond/NursingSchool_HomePage.htm. • No printed copies available. • Any amendments will be posted on web site. • RFPs due by 7/31/2009 at 2:00 p.m. to the attention of Mr. Tim McMullen. • Selection during the week of September 21st. • CD with five (5) copies of submittal limited to 75 pages. • Reference SCO ID# 70720301 and title of project on title page of submittal. • Direct all questions prior to submittal to Eric Frazier at efrazier@nccu.edu.

  13. RFP Submittal – Items of Note • All submittals will be reviewed by a selection committee • Submittal criteria on page 5. • Evaluation criteria and procedures on pages 15 and 16. • Oral presentations are required of down-selected firms. • HUB Participation of 10%

  14. RFP Submittal – HUB Resources • The University’s goal is a minimum of 10% HUB Participation. • Minority participation should be at the upper management level • Office for Historically Underutilized Businesses • http://www.doa.nc.gov/hub/index.htm • UNC – General Administration HUB Resources • http://www.northcarolina.edu/content.php/vendors/index.htm • Minority Participation Guidelines and Forms • HUB Forms and Resources

  15. Site Tours • Rules to observe while on campus. • Tour as a group. • Tour during regular business hours Monday through Friday, and by appointment during weekends. • Obtain a parking permit – very important. • Notify the University (Eric Frazier) prior to prior to visit and upon arrival (efrazier@nccu.edu, 919-530-6696).

  16. Site Locations

  17. Site Locations – Nursing School

  18. Site Locations – Church

  19. Questions and Answers ?

  20. Closing Remarks Mr. Timothy F. McMullen, R. A. University Architect Director of Design and Construction Services Mr. Zack Abegunrin, PE Vice Chancellor for Facilities Management

  21. “Truth and Service”

More Related