1 / 8

Beam test of new ROCs

Beam test of new ROCs. David Christian Fermilab November 8, 2011. Why talk about FNAL test beam?. No beam will be available at CERN during Long Shutdown 1 (all of 2013) PSI46dig_v2 (pixel ROC for Phase 1) is likely to be ready for a beam test of rate capability exactly when LS1 starts.

taryn
Download Presentation

Beam test of new ROCs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam test of new ROCs David Christian Fermilab November 8, 2011

  2. Why talk about FNAL test beam? • No beam will be available at CERN during Long Shutdown 1 (all of 2013) • PSI46dig_v2 (pixel ROC for Phase 1) is likely to be ready for a beam test of rate capability exactly when LS1 starts. • Rate capability can be tested at PSI, but only with low energy pions precision measurements are problematic • Note: FNAL machines will be shut down for ~11 months in 2012-2013. The shutdown is currently scheduled to start on March 1, 2012, but this date is likely to slip by 2-3 months.

  3. What is required? • Short section of beamline (less than 1 meter) • Beam spot larger than 1 pixel ROC (8mm x 8mm) • Rate adjustable up to ~500 MHz/cm2 • High energy particles (to minimize interactions and multiple scattering)

  4. Fermilab Accelerator Complex MTest MCenter (next slide) P2 P1 MI52 P1  P2  3 km beam line from MI52 to MT6 and MC7

  5. Test beam facility Proposed location

  6. Detail • A variety of beams can currently be delivered to MT6, but only at much lower intensity than required (Area is lightly shielded). • Upstream enclosures are shielded for primary beam (much higher intensity than required). • Rate is limited by a “pinhole collimator” in M03. • Capability of splitting primary beam many ways still exists. • Can get the desired rate and spot size in M03 using two beam splits & existing quads.

  7. Video • Video of M03

  8. Conclusion • Rates tests of the pixel ROC can be done at FNAL. • A new running condition is required (radiation safety ok) • The sooner a request is made to FNAL, the better.

More Related