Pre-Construction Concrete Conference Agenda

Pre-Construction Concrete Conference Agenda. Project: Project name Location: Project Location Scope of Work: Description of scope (i.e. foundation, sog , elevated slabs, etc.) Start Date: Date.

Download Presentation

Pre-Construction Concrete Conference Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pre-Construction Concrete Conference Agenda

  2. Project: Project name Location: Project Location Scope of Work: Description of scope (i.e. foundation, sog, elevated slabs, etc.) Start Date: Date

  3. Attendees: Owner / Owner Representative Design Architect Design Engineer Construction Manager Contractor Testing Laboratory Inspection Agency Concrete Contractor Concrete Supplier Admixture Supplier

  4. A. Administrative a. Specificationsb. Contract Drawings c. Rebar Shop Drawings d. Construction & Contraction Joint Layout e. Ordering and scheduling concrete delivery f. Report Distribution - Promptly to all attendees noted aboveg. Delivery Tickets

  5. B. Jobsite Conditions a. Safety b. Sub-grade Construction and Acceptance c. Hot & Cold Weather Plans d. Protection Plans, Mix Adjustments I. Walls II. Slabs

  6. B. cont. e. Slump adjustments by held water or by HRWR admixtures. High range water reducing admixtureredosage chart is required from the concrete producer. This procedure restores the slump or spread to the approved range. f. Power, Light Water g. Survey Control (Benchmark / Axis Lines)h. Ventilation i. Washout

  7. C. Materialsa. Concrete design mixes are discussed immediately after concrete producer selection. Mix # Psi P/C Use & Description 1 2 3 4 5 6

  8. C. cont. a. Micro Fibers b. Macro Fibers c. Accelerator d. Dowels e. Formwork and Removal f. Vapor Barrier g. Curing

  9. D. Placing and Finishing a. Conveyance b. Consolidating c. Finishes I. Horizontal Finishes II. Exposed Vertical Surfaces

  10. E. Testing & Quality Assurance a. Location of testing – batch truck / discharge end of concrete pump b. Acceptance criteria at site I. Time, slump, temp, air, water content (Microwave Test)c. Quality control and assurance. Cylinder curing box (ASTM C31)d. FF / FL testing e. Specimen storage, transport and testing f. Report distribution - Prompt and to all attendees noted at the pre-concrete conferece