1 / 9

Third Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

Third Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting. Jérôme Benveniste ENVISAT RA-2/MWR Cross-Calibration and Validation Team Coordinator European Space Agency, Earth Observation Applications Department

taya
Download Presentation

Third Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Third Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAMMeeting Jérôme Benveniste ENVISAT RA-2/MWR Cross-Calibration andValidation Team Coordinator European Space Agency, Earth Observation Applications Department ESRIN, Via Galileo Galilei, I-00044, Frascati (RM), Italy, (e-mail: Jerome.Benveniste@esa.int) RA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01

  2. Objectives of the Meeting • Review the minutes of last meeting • Review the actions • Verify and freeze data requirements • Review plan version 1.0 and freeze before end of year • Assess readiness of the CCVTeam • Questions from Members? • Close open issues • plan for the ones still open RA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01

  3. Agenda • Introduction and Objectives of the Meeting (JB) • Review of the minutes of the CCVT second plenary meeting, 14/12/2000 • closing of actions • ENVISAT Mission Status (JB) • ERS-2 RA/MWR Mission and Data (PF/AM) • ERS-2 Radar Altimeter Performance (AM) • ERS-2 MWR Health Status (PF/CETP) • Data requirement, circulation and rehearsal (LR) • MWR Calibration and Validation subgroup status (PF) • Level 2 Products and Algorithms Verification subgroup status (MM) • Review of the CCVT consolidated Plan (ALL) • RA-2/MWR Products Handbook (JB) • Readiness of each Member (ALL) • Identification of remaining issues/actions (JB+ALL) • Outlook, Schedule, date of the next meeting (JB) • AOB RA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01

  4. CCVTeam Actions • ACTION 7.1: B.Chapron to submit Data requirement). • ACTION 7.2: ALL to endorse the statements on the required consistencies of corrections • ACTION 7.3: Every CCVT member using OPR and WAP to send to JB the standard recipe actually applied to the product • ACTION 7.4: JB to produce a specification for "standard" OPR and WAP data • ACTION 7.5: PC, BC, JB (+ALL) further develop the error formalism • ACTION 7.6: ALL to endorse (or discuss) Accuracy Objectives • ACTION 7.7: ALL to Sign a Statement of Work RA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01

  5. RA-2/MWR Product Tree RA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01

  6. ENVISAT Mission Status • Satellite in storage at Kourou • Ready for Launch Campaign • Ground Segment Reviews this month • Delta GS Readiness Review • Nominal Launch date is 01/12/2001 • Envisat is next passenger on Ariane 5 • Next key date is end September - Arianespace publish test results RA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01

  7. Schedule ---- use page 90 of PLAN v1.0 RA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01

  8. Conclusion • Review of Actions • Data requirements frozen • Next steps: • Review version 1.0 of the Plan • Establish and sign Statement of Work • Schedule • Meetings • Date and place of the next meeting • After Launch (L+2m and/or L+3m) RA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01

More Related