140 likes | 352 Views
JOINT PROJECT MANAGER COLLECTIVE PROTECTION (JPM-CP). April 26, 2005 Advanced Planning Brief to Industry. STAN ENATSKY JPM-CP Joint Program Executive Office for Chemical and Biological Defense Stanley.enatsky@navy.mil. Outline. Program Overview Warfigther Needs Technical Challenges
E N D
JOINT PROJECT MANAGERCOLLECTIVE PROTECTION (JPM-CP) April 26, 2005Advanced Planning Brief to Industry STAN ENATSKY JPM-CP Joint Program Executive Office for Chemical and Biological Defense Stanley.enatsky@navy.mil 050426_APBI_JPM_CP
Outline • Program Overview • Warfigther Needs • Technical Challenges • Acquisition Strategy/Funding/Schedule • Business Opportunities • Contacts 050426_APBI_JPM_CP
Program Overview Mission: Research, develop, procure, field and dispose of Collective Protection equipment and systems that protect personnel and equipment from chemical, biological, radiological and toxic industrial contamination within controlled boundaries. 050426_APBI_JPM_CP
Program Overview (cont’d) • Collective Protection (CP) Provides: • Protection to Mission Essential Resources Afforded to Controlled Areas or Zones Allowing a Force Structure to Operate Safely, at Near-normal Levels While in a Chemical, Biological, Radiological, or Toxic Environment. • Essential Resources Include: • Personnel and Equipment • Mobile Assets (Vehicles, Ships, Aircraft) • Transportable Assets (Hard & Soft Shelters) • Fixed Assets (Buildings) 050426_APBI_JPM_CP
Warfighter Needs • Environmental Control of Areas or Zones to: • Prevent Infiltration of CBR and Toxic Industrial Hazards • Supply Clean, Breathable Air • Allow Ingress and Egress Without Compromising the Protected Boundary • Areas Typically Collectively Protected: • Mission Critical • Command and Control • Medical Care • Rest and Relief • Weapon System Control 050426_APBI_JPM_CP
Technical Challenges • Evolving Threat • Integrating with Expeditionary Missions • Designing for Modularity and Component Flexibility • Reducing Equipment Size, Weight and Power • Reducing Sustainment Costs 050426_APBI_JPM_CP
Acquisition Strategy • Conduct CP Technology Readiness Evaluations (TRE) • Identify new Mature Technologies to Meet Warfighter Needs • Standardized Tests, Evaluations, and Technology Readiness Level Assessments • Transition Technologies to Existing and New CP System • CP TRE FY2005 • Assessments Begin 3QFY05 • Testing 4QFY05 Thru 1QFY06 • Technology Areas of Interest • Air Purification • CB Barrier Materials • Support Equipment for CP • Whole CP Systems 050426_APBI_JPM_CP
Acquisition Strategy (cont’d) • Joint Expeditionary Collective Protection (JECP) is Spiral Development Program • JECP Increment 1 is Fully Funded • May Enter Acquisition Process at Milestone B and/or C Depending on Technology Maturity • Tailored Analysis of Alternatives (AoA) – 2QFY06 • Technology Demonstrations – 2QFY06 Through 4QFY06 • Emphasis on Supportability, Size, Weight and Power Consumption • Modularity and Scalability of Individual Technologies • Procure Chemical Biological Protective Shelter (CBPS) System as Funded Within FYDP 050426_APBI_JPM_CP
FY06 FY07 FY08 FY09 FY10 FY11 JECP Schedule / Funding Increment One RDT&E IOT&E Production 050426_APBI_JPM_CP
Business Opportunity - JECP • Increment 1 - System Development & Demonstration • Cost Plus Incentive Fee (CPIF) Contract for Prototype Development and Test 2QFY07 with LRIP Option • RFP 3QFY06 • Prototype Development and Testing • Integrate Technologies Identified by CP 2005 TRE • Expeditionary CP for Rest/Relief and Command/Control • Reduced Footprint and Improved Strike and Erect over Legacy Systems • Quantities TBD Pending Development/Approval of Capability Development Doc 050426_APBI_JPM_CP
Business Opportunity - CBPS • Chem/Bio Protective Shelter - Electric • Procurement Against Performance Based Specification for 175 to 1000 Systems • Final Request For Proposal 3QFY05 • Award Firm, Fixed Priced Indefinite Delivery Indefinite Quantity 5-Year Contract 1QFY06 050426_APBI_JPM_CP
Points of Contact • Joint Project Manager-Collective Protection • Stan Enatsky • (202) 781-3741 • stanley.enatsky@navy.mil • stan.enatsky@jpeocbd.osd.mil • Deputy Joint Project Manager-Collective Protection • Mike Abaie • (540) 653-2719 • michael.abaie@navy.mil 050426_APBI_JPM_CP