CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw. Jan Królikowski Warsaw University. PACT tasks. PACT ESR. The Electronics System Review of the PACT Muon Trigger was held on July, 8th, 2003 in Warsaw.

lindsay
Download Presentation

CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMS Annual Review 2003PACT - theRPC Muon TriggerBari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University

  2. PACT tasks Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  3. PACT ESR • The Electronics System Review of the PACT Muon Trigger was held on July, 8th, 2003 in Warsaw. • The extensive documentation prepared for this review can be found at :http://hep.fuw.edu.pl/cms/esr/. This documentation reflects the present status of the project. Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  4. Outline • PACT layout • Progress since 2002 / Open issues • Link system • Counting room electronics • Cost, schedule and milestones Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  5. Coverage of initial system4 stations up to ~ 1.24 ; 3 up to ~1.6 Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  6. PACT electronics: layout and main components Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  7. PACT inventory Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  8. Progress since 2002 • UXC55 electronics: • progress in the Link System prototypes and design. Now entering preparation of production phase. • Firming up of the LB boxes installation plans. • UCS55 electronics: • progress in PAC algorithms and FPGA implementation of 4/6 plane algorithms, • VHDL codes for many compnents (sorters, GhostBusters) developed and tested, • New SorterCrate architechture • Overall organization of the project • New division of tasks between Bari/ Laapperanta/ Warsaw Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  9. UXC55 electronicsProgress in the Link system • Link Board + Control Board + Optical Link: prototypes succesfully tested in the LHC-like beam in May 2003 • Monitoring of the RPC performance and test pulses – succesfully tested as well. • Powerful diagnostic tools installed on the LB • Setting up of the RPC FEB parameters via I2C still to be tested. • Radiation tests of FPGAs and FLASH memories • Reloading of FPGAs on the LB every 4-10 minutes is sufficient • Integration and installation issuses: constant progress Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  10. LB functionalities Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  11. LB RE1/1 prototype 2003 Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  12. Tested functionalities of Link System • Synchronization of signals from chambers • Histogram of signals in synchronization window • Histogram of all signals from chambers • Histogram “bx history” • “Snapshots” • Test pulses • TTCrx signals distribution • LB FPGAs loading from CB • CCU and VME interfaces Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  13. Tested functionalities of Link System • Synchronization of signals from chambers • Histogram of signals in synchronization window • Histogram of all signals from chambers • Histogram “bx history” • “Snapshots” • Test pulses • TTCrx signals distribution • LB FPGAs loading from CB • CCU and VME interfaces Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  14. Test PulsesSharpness of the Synchronization Window Test pulse directly connected to input channel with short (~5cm) cable Test pulse Synchronization window widow open widow close The sharpness of the synchronization window edge is ~0.3 ns (one channel) Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  15. Test PulsesInput Channels Skew One test pulse directly connected to each input channel Found the source of the problem: big skew between input channels (~1ns) Reason: differences in paths lengths on the PCB After fixing the paths lengths the skew should be reduced to ~0.4ns Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  16. Beam testsHistograms The muon beam profile The „bx history” histogram - train of 48 bx’s with muons Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  17. Beam testsWindow Size and Position Scans Ratio of chamber noise signals in synchronization window to all measured. The beam bunch time shape scanned with 1ns window Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  18. Beam testsSnapshots Bx RB1 Channel RB2 Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  19. Beam testsSnapshots, Clusters Size Distribution Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  20. Conclusions from the LB system tests in May 2003 The histograms and snapshots work well and have proved their usefulness in testing the performance of chambers. TTCrx signals distribution, test pulses and FPGA loading work well. Optical link will be tested as soon as the quartz for the PLL is available Problems with CCU block transfer and I2C control of FEBs Solved now Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  21. Conclusions of 2002 and 2003 radiation tests in Jyvaskyla Xilinx Spartan-IIE chips have small enough SEU in configuration bits Dynamic SEU are much less probable then SEU in configuration bits Reloading of the FPGAs every 10 minutes should guarantee that at most a few SEUs will be accumulated in all LBs FPGAs, what should not affect the system performance FLASH memories are resistant enough to radiation and will be used on final Control Boards More details http://hep.fuw.edu.pl/cms/esr/docs/RadiationTests.pdf Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  22. LB boxes (LBx) inventory Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  23. RE1/1 LB boxes – a special case Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  24. Standard LB boxes VME crates Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  25. Integration issues: position of LB boxes in the racks on the balconies L max= 11.5 m Cabling RE1/2 and 1/3 signalsLink Board Boxes (VME crates) in Racks Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  26. YE-1 Racks on Towers Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  27. Barrel cabling S.Bally Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  28. Progress in UCS55 electronics Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  29. USC55 inventory Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  30. PAC processor – progress in the VHDL codes Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  31. FPGA PAC in the barrel Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  32. FPGA PAC in the endcaps Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  33. Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  34. Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  35. COST • We are revising the PACT CORE cost estimate. • At present, the CORE costs are 3750kCHF, while our starting estimate in 1997 was 3695 kCHF. • This cost estimate is for the full trigger system up to eta=2.1 but without RE5. Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  36. COST contd. • Financing: • Finland 1020 kCHF • Poland 2060 kCHF • Bari 100 kCHF • TOTAL 3180 kCHF • + Korea 400 kCHF ? Almost enough for up to eta=1.6 Conclusion: either design a cheaper system or stage and hope for extra funding. Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  37. COST contd. • Main cost uncertainties/ drivers: • PAC FPGAs – assumed 300 CHF/pc, total amount for PAC FPGA 345 kCHF, • present cost of SPARTAN ALTERAs are higher. • Splitter system – assumed 1000 CHF/ TB, total amount for splitters 108 kCHF. The cost drivers are opto receivers (on the TB as well as on Splitter Bds) / opto transmitters. Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  38. Staging and Cost Saving • First approximation for the strategy for PACT electronics construction: • Order elements for LB system for existing RPCs (up to eta=1.6, w/o RE5) and RE11 (difficulties in latter installation of LBx there). • Order elements and assembly Splitter System only for existing RPCs. • Order elements and assembly TB w/o PAC FPGAs for the complete system. • Order PAC FPGAs for towers up to eta=1.6 • If not out of money order more FPGAs/ Links. Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  39. Schedule defined Nov. ‘02 Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  40. LB project schedule Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  41. Splitter schedule 2002 2003 2004 Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  42. TB- TC- Integration schedule Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  43. Milestones defined Nov. ‘02 Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  44. Manpower • Warsaw: electronics engineers + WUT students 2.5 + 2 (FTE) • PhD students 1.5 • Technicians 1.5 • Programmers 0.8 • Finland: • Bari: Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003

  45. Conclusions • COST: • Almost within estimates from 1997 • Still substantial uncertainties ( 10 %, maybe even up to 20%?) but firming up • SCHEDULE: • Tight • Critical path: LB mechanics, splitters, trigger board • MANPOWER: • Biggest worry • Recently more help from Finland (LB production and Splitters) • Warsaw manpower sufficient for USC55 electronics - TB/ ROB/TC • Bari: suficient for Sorter Crate Jan Królikowski, CMS Annual Review, CERN Sept. 16, 2003