CDM Project Portfolio Egypt. Amr Abdel-Aziz, Ph.D. Egypt. CDM Projects Portfolio. 28 Projects. Egyptian CDM Strategy. CD4CDM Project. Egyptian DNA. Current Active CDM Project Portfolio - 5 PDDs - 7 PINs. 12 Projects. Egyptian CDM Strategy Projects. Electricity Generation
E N D
CDM Project PortfolioEgypt Amr Abdel-Aziz, Ph.D. Egypt
CDM Projects Portfolio 28 Projects Egyptian CDM Strategy CD4CDM Project Egyptian DNA Current Active CDM Project Portfolio - 5 PDDs - 7 PINs 12 Projects
Egyptian CDM Strategy Projects • Electricity Generation • Wind Farms (1) • Integrated Solar Thermal System (1) • Other Renewable Energy Applications • Solar Energy Applications(2) • Transportation Projects • Railways Electrification Projects(1) • Underground (1) • Waterway Transportation (1) • Switching to N.G in Transportation (1)
Egyptian CDM Strategy Projects • Energy Efficiency • Control Systems and Energy Saving Equipment (1) • Waste Heat Recovery (1) • Cogeneration (4) • WasteManagement • Solid Waste Management (2) • Land Use, Land-Use Change and Forestry • Tree Plantations Using Sewage Water (2) • Protection of Irrigation and Drainage Canals (1) • Stabilization of Coastal Sand Dunes (1) • Protection of Roads and Highways (1)
Renewable Energy Energy Efficiency Waste Developed PDDs • Zaafarana 85 MW Windfarm (LS) • Damietta Barage Mini-Hydro (SS) • Glass Dying Fuel Switching (SS) • El Nasr Cartoon Cogeneration (SS) • Onyx Gas Capture and Flaring (LS)
Energy Efficiency Afforestation Waste Developed PINs • Brick Factories Fuel Switching • Zenotex Energy Management System • Misr El Monofyia Cogeneration • Greater Cairo Ring Road • 10th of Ramadan • Cairo Aswan Road • Bioreactor Landfill Gas Capture and Flaring in Greater Cairo
Onyx Gas Capture and Flaring Project Location • Borg El Arab and El Hammam, Alexandria
Onyx Gas Capture and Flaring Project Description • Flaring excess methane not needed for leachate treatment Technology • 3 flaring units of capacity 1,500 m3/h each
Onyx Gas Capture and Flaring Project Emissions Reduction • Crediting Period: 11 y 4 m • Annual CERs: 400,000 (average) • Total CERs (11 y and 4 m): 4.8 M Starting Date • June 2005 Cost • $ 0.9 M
Onyx Gas Capture and Flaring Project Project Status • PDD: Final Draft • Financing Situation: Self Financed • DNA Approval: Preliminary approval • Project Implementation: Not yet
Zaafarana 85 MW Wind Farm Location • Zaafarana, Red Sea
Zaafarana 85 MW Wind Farm Description • 100X850 kW Wind Turbines • 9 m/s Average Wind Speed • 45% capacity factor • 335 GWh/year Technology • Three blade wind turbine • Type G52 • Manufactured by GAMESA (Spanish Co.)
Zaafarana 85 MW Wind Farm Emissions Reduction • Crediting Period: 21 Years • Annual CERs: 155,313 • Total CERs (20 Y): 3 M Starting Date • June 2005 Cost • $ 90 M
Zaafarana 85 MW Wind Farm Project Status • PDD: Final Draft • Financing Situation: Self / Spanish Financing • DNA Approval: Preliminary approval • Project Implementation: Not yet
Damietta Barrage Small HydroPower Project Location • Al-Qanater Al-Khairyyah, Qalyoubyia
Damietta Barrage Small HydroPower Project Description • Power plant within the river channel immediately downstream Damietta Barrage Technology • Powerhouse with three 4.15 m diameter bulb turbines • A 114 m forebay enclosed by an embankment
Damietta Barrage Small HydroPower Project Emissions Reduction • Crediting Period: 21 y • Annual CERs: 47,000 • Total CERs (21 y): 988,200 Starting Date • June 2007 Cost • $ 35 M
Damietta Barrage Small HydroPower Project Project Status • PDD: Final Draft • Financing Situation: Sponsored by KfW • DNA Approval: Preliminary approval • Project Implementation: Not yet
Glass Dying Fuel Switching Project Location • Shoubra El Kheima, Qalyoubyia
Glass Dying Fuel Switching Project Description • Switching 3 steam boilers (two 6 t/hr and one 4 t/hr) operating on fuel oil and a gas oil boiler to natural gas Technology • Natural gas-based burners and an automatic control system
Glass Dying Fuel Switching Project Emissions Reduction • Crediting Period: 21 y • Annual CERs: 4,600 • Total CERs (21 y): 96,600 Starting Date • Jan 2006 Cost • $ 90,000
Glass Dying Fuel Switching Project Project Status • PDD: Final Draft • Financing Situation: Requires external funding • DNA Approval: Preliminary approval • Project Implementation: Not yet
El Nasr Company Cogeneration Project Location • Borg El Arab, Alexandria
Cogeneration unit El Nasr Company Cogeneration Project Description • Generation of base electricity and heat (steam) from a NG cogeneration unit to replace electricity from the grid and gas oil for boiler Technology • 1.1MWe NG-based gas cogeneration set
El Nasr Company Cogeneration Project Emissions Reduction • Crediting Period: 10 y • Annual CERs: 2,500 • Total CERs (10 y): 25,000 Starting Date • Dec 2005 Cost • $ 370,000
El Nasr Company Cogeneration Project Project Status • PDD: Final Draft • Financing Situation: Requires external funding • DNA Approval: Preliminary approval • Project Implementation: Not yet