70 likes | 253 Views
Maintenance Division. State Bridge Grant Program. Before. After. State Bridge Grant Program. Before. After. State Bridge Grant Program. Funding. $4,770,000 50%. $4,770,000 50%. FY 2010-2011 $9.54 million The funds are distributed to the counties as follows:
E N D
State Bridge Grant Program Before After
State Bridge Grant Program Before After
State Bridge Grant Program Funding $4,770,000 50% $4,770,000 50% • FY 2010-2011 $9.54 million • The funds are distributed to the counties as follows: • 50% equally among the ninety-five (95) counties • 50% based on need • Use of these funds requires a 20% match by the county either in cash, work-in-kind, or a combination.
State Aid Road Program Begun in 1983 Provides money to counties for improvements to roads on this system Local routes in each county are designated State Aid routes Function as connector routes linking important traffic generators within the county They comprise 15-20 % of the total road miles in the county The types of qualifying work include the planning, engineering, right-of-way acquisition, grading, drainage, bridge construction, and pavement upgrades or rehabilitation
State Aid Road Program The State Aid office has personnel in each of the department’s four regional offices. The region personnel meet with the county officials in their region Together they work out an annual work program and assist the county officials Region State Aid personnel make a final inspection If the project is acceptable and the region office has received the proper construction certification, final payment will be made to the county.
State Aid Road Program Funding $5,270,500 25% $10,541,00 50% FY 2010-2011 $21.082 million The funds are distributed to the counties as follows: 50% equally among the ninety-five (95) counties 25% based on area 25% based on population. Use of these funds requires a 25% match by the county $5,270,500 25%